States › Connecticut

Still River Greenway

Greenway in Connecticut · OpenStreetMap relation

Runs through Brookfield

Conditions now

Loading the weather near Brookfield Center…

Forecast by the National Weather Service for Brookfield Center · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Still River Greenway is a multi-use trail and greenway along the Still River in Brookfield, Connecticut. With both phases complete, the trail runs from the Brookfield Municipal Center to the Brookfield Town Center and is completely paved. The other section of the trail runs from the Municipal Center, and loops around in the woods.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Managed by Town of Brookfield.4

Length
1.6 mi 2.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Laurel Hill Road mile 0.2 directions to trailhead 1
  2. Parking at Silvermine Road mile 0.9 directions to trailhead 2
Still River Greenway Trail 1.jpg (opens in a new tab)
Still River Greenway Trail 1.jpg · Photo: AirportExpert · CC0 · Wikimedia Commons

About this trail

The Still River Greenway is a paved path in the town of Brookfield, Connecticut, running between the Brookfield Municipal Center and the town center known as the Four Corners. It is a greenway, not a rail trail, and it is a different trail from the Sue Grossman Still River Greenway between Torrington and Winsted. The Town of Brookfield operates it. The town proposed the greenway in a Residents Needs Assessment study in 2000; construction began in 2011, the first phase with the Silvermine Road entrance was finished in 2012, and the second phase, the rest of the trail, in 2016.

Wikipedia gives the main route as 2.25 miles; the mapped path is about 1.6 miles. Entrances are on Silvermine Road and on Federal Road, where the greenway meets the Brookfield Center sidewalk. Along the way it passes under Route 7 and crosses the Still River on a footbridge that Wikipedia describes as the longest in Connecticut. A separate section begins at Arthur A. Harris Linear Park and loops through the woods.

The main route is asphalt, with several wooden boardwalk sections. A March 2026 report said the town had received state transportation funding, through the Connecticut Department of Transportation's Local Transportation Capital Improvement Program, for an extension of about half a mile from behind the Brookfield Police Department to a parking area on Pocono Road, where the gravel lot is to be paved and lit; construction was estimated at $1.1 million and design was about 30 percent complete. Longer-range plans call for links north to New Milford and south to Danbury, toward a network from New Milford to Norwalk joining the East Coast Greenway.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

59% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Danbury, 7.8 km from the trail's middle, 40 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F363948607280858275625040
Low °F202229394959646355433426
Precipitation, in3.73.34.44.24.24.854.94.9544.6
Snow, in15.71110.41.70000001.98.6
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Danbury sheet (1:62,500); the 1953 Danbury sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14523454, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Still River Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q30641804, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Town of Brookfield · Official site · checked Oct 31, 2026
  5. Still River Greenway — Wikipedia · organization · checked Oct 17, 2026
    Supports: Brookfield; Municipal Center to Four Corners town center; 2.25-mile length; 2000 proposal, 2011 construction start, 2012 phase one (Silvermine Road), 2016 phase two; entrances on Silvermine Road and Federal Road; Brookfield Center sidewalk connection; under Route 7; Still River footbridge described as longest in Connecticut; Arthur A. Harris Linear Park loop section; paved; plans to connect to New Milford and Danbury and a New Milford-Norwalk network linking the East Coast Greenway
  6. Brookfield Still River Greenway Trail Extension Approved With $1.1M Grant — Brookfield Patch (March 6, 2026) · press · checked Oct 17, 2026
    Supports: half-mile extension from behind the Police Department to Pocono Road parking area; gravel lot to be paved and lit; $1.1 million estimated construction cost; CTDOT LOTCIP funding; design about 30 percent complete
  7. Still River Greenway (relation 14523454) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: operator Town of Brookfield; mapped length about 1.6 miles; asphalt surface with wooden boardwalk sections

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.