Stowe Recreational Path
Greenway in Vermont
Runs through Stowe · Lamoille County
Conditions now
Loading the weather near Stowe…
Forecast by the National Weather Service for Stowe · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Stowe Recreation Path, also called the Stowe Bike Path, is a greenway located in Stowe, Vermont, United States The 5.3-mile (8.5 km) recreation trail was built in two phases, 1981–84 and 1986–89, at a total cost of US$680,000. The Stowe Recreation Path has received several awards and honors, and many people consider it a great improvement to the town.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Main Street mile 0 · restrooms directions to trailhead 1
- Parking at Main Street mile 0 · restrooms directions to trailhead 2
- Parking at Main Street mile 0 · restrooms directions to trailhead 3
- Parking at Main Street mile 0 · restrooms directions to trailhead 4
- Parking at Dump Road mile 0.4 directions to trailhead 5
- Parking at Weeks Hill Road mile 0.8 directions to trailhead 6
- Parking at Mountain Road mile 1.6 directions to trailhead 7
- Parking at Mountain Road mile 1.7 directions to trailhead 8
- Parking at Cape Cod Road mile 2.2 directions to trailhead 9
- Parking at Cape Cod Road mile 2.2 directions to trailhead 10
- Parking at Mountain Road mile 2.2 directions to trailhead 11
- Parking at Cape Cod Road mile 2.2 directions to trailhead 12
- Parking at Mountain Road mile 2.3 directions to trailhead 13
- Parking at Mountain Road mile 2.3 directions to trailhead 14
- Parking at Mountain Road mile 2.3 directions to trailhead 15
- Parking at Mountain Road mile 2.4 directions to trailhead 16
- Parking at Mountain Road mile 2.4 directions to trailhead 17
- Parking at Mountain Road mile 2.4 directions to trailhead 18
- Parking at Mountain Road mile 2.5 directions to trailhead 19
- Parking at Mountain Road mile 2.5 directions to trailhead 20
- Parking at Mountain Road mile 2.5 directions to trailhead 21
- Parking at Luce Hill Road mile 2.6 directions to trailhead 22
- Parking at Luce Hill Road mile 2.9 directions to trailhead 23
- Parking at Mountain Road mile 3.5 directions to trailhead 24
- Parking at Brook Road mile 5.2 directions to trailhead 25
Plan your visit
- National Recreation TrailDesignated in 1990 National Recreation Trails database
Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Stowe Recreation Path, also called the Stowe Bike Path, is a 5.3-mile paved greenway in Stowe, Vermont, maintained by the town. It runs from Stowe Village to the Topnotch area on Mountain Road (Route 108), crossing back and forth over the West Branch of the Little River, and was designated a National Recreation Trail on November 14, 1990.
Planning began in 1964, when the Stowe Better Business Association voted for a walking path beside Mountain Road to relieve traffic. In 1977 Claire Lintilhac commissioned the Vermont Highway Department to design a route, and in 1981 the town hired a coordinator, Anne Lusk. The first 2.7 miles of the 8-foot-wide path, with 16 bridges, were built between 1981 and 1984 for $300,000 on easements donated across 27 parcels. A 2.6-mile extension followed from 1986 to 1989 for $380,000, bringing the total to $680,000, paid from private donations, federal Land and Water Conservation Funds, the Lintilhac Foundation, town taxes and revenue sharing funds.
The path starts behind the Stowe Community Church and ends behind Topnotch; its north trailhead is on Brook Road, with access at Thompson Park, Chase Park and Cape Cod Road between. In 2010 the Friends of Rec Path Grooming and other residents asked the Select Board to groom the path in winter, and in 2011 the town bought grooming equipment and opened it for all-season use. It is used for walking, running, cycling, in-line skating, snowshoeing and cross-country skiing. Bike maintenance stations were installed at Lintilhac Park and Chase Park in 2017.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
45% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Morrisville Stowe State Airport, 10.5 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 26 30 38 52 66 74 79 77 70 56 43 32 Low °F 5 6 17 29 40 50 55 53 45 35 25 14 Precipitation, in 2.2 1.5 1.9 2.8 3.5 3.8 4.2 3.5 3.1 3.6 2.8 2.5 - On the National Register
- Stowe Village Historic District, Stowe · historic district, listed 1978 · nomination file for Stowe Village Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1919 Montpelier sheet (1:62,500); the 1968 Stowe sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/vermont
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Stowe Recreation Path”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7620698, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Stowe Recreation Path — National Recreation Trails Database (American Trails) · organization · checked Oct 13, 2026 Supports: 5.3-mile paved greenway from Stowe Village to Topnotch on Mountain Road, crosses the West Branch of the Little River, 2010 grooming proposal by the Friends of Rec Path Grooming, town grooming equipment and all-season use from 2011, allowed uses, bike maintenance stations at Lintilhac Park and Chase Park in 2017, certified as an NRT November 14, 1990, Town of Stowe contact
- Stowe Recreation Path — Wikipedia · organization · checked Oct 13, 2026 Supports: name Stowe Bike Path, town maintenance, 1964 Better Business Association vote, 1977 Lintilhac design commission, 1981 coordinator Anne Lusk, first 2.7 miles 1981–84 with 16 bridges for $300,000 on 27 donated parcels, 8-foot width, 2.6-mile extension 1986–89 for $380,000, $680,000 total and funding sources, start behind the Community Church and end behind Topnotch, trailheads and access points
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.