Sunflower Santa Fe Trail
Rail-trail in Kansas · OpenStreetMap relation
Runs through Galva and Hillsboro · McPherson and Marion counties
Conditions now
Loading the weather near Galva…
Forecast by the National Weather Service for Galva · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West 1st Street directions to trailhead 1
- Parking at West 1st Street directions to trailhead 2
- Parking at North Main Street directions to trailhead 3
- Parking at East 1st Street directions to trailhead 4
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Sunflower Santa Fe Trail is a planned 33-mile rail-trail between McPherson and Marion in central Kansas. It follows the former Marion and McPherson Railroad, a leg of the Atchison, Topeka & Santa Fe Railway, and passes through Galva, Canton, Lehigh and Hillsboro alongside U.S. Highway 56. The Central Kansas Conservancy, which operates as Central Kansas Trails, received the right-of-way from the Central Kansas Railroad; it runs from just east of Seventeenth Avenue in McPherson County to the west edge of Marion.
Only part of the corridor is open. The Kansas Rail-Trails Council lists about 2 of the planned 33.4 miles as open, and the conservancy says a portion is open east and west of Galva. OpenStreetMap maps this record in three pieces: roughly 0.8 mile west of Galva, roughly 0.8 mile east of it, and about 2 miles in Hillsboro running east from the center of town. The conservancy plans to resume work after it finishes the Meadowlark Trail at McPherson, which the Sunflower trail is meant to join. Near Canton the route passes close to the junction of the historic Santa Fe, Chisholm and Cherokee trails.
Hillsboro also has its own 1.4-mile Hillsboro Trail, managed by the Hillsboro Recreation Commission, which the council lists separately.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 23% of this route as a trail on former railroad right-of-way.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Marion Rsvr, 11.6 km from the trail's middle, 20 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 41 46 57 67 76 87 92 91 83 70 56 44 Low °F 21 25 35 45 56 66 70 68 59 47 34 25 Precipitation, in 0.8 1.2 2.1 3.1 5.2 4.5 4.3 4 3.5 2.5 1.4 1.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Newton sheet (1:125,000); the 1955 Hutchinson sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationCentral Kansas Trails (Central Kansas Conservancy)
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 7756846, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sunflower Trail — Central Kansas Trails (Central Kansas Conservancy) · organization · checked Oct 18, 2026 Supports: 33-mile Marion to McPherson route; towns; Marion and McPherson Railroad as an Atchison, Topeka & Santa Fe leg; U.S. 56; junction of Santa Fe, Chisholm and Cherokee trails near Canton; planned link to the Meadowlark Trail
- CKC FAQ — Central Kansas Trails · organization · checked Oct 18, 2026 Supports: portion open east and west of Galva; right-of-way transferred by the Central Kansas Railroad to CKC and its extent; work to resume after the Meadowlark Trail
- Kansas Rail-Trails — Kansas Trails Council · organization · checked Oct 18, 2026 Supports: 2 miles open of 33.4 planned; towns; Central Kansas Trails as manager; separate 1.4-mile Hillsboro Trail managed by the Hillsboro Recreation Commission
- OpenStreetMap relation 7756846 (Sunflower Santa Fe Trail) · web · checked Oct 18, 2026 Supports: mapped pieces near Galva and in Hillsboro and their approximate lengths
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.