States › Oregon

Sunrise Shared-Use Path

Greenway in Oregon

In Clackamas County

Conditions now

Loading the weather near Happy Valley…

Forecast by the National Weather Service for Happy Valley · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.2 mi 2.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Happy Valley, along the trail (opens in a new tab)
Happy Valley, along the trail · Photo: Esprqii · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Sunrise Shared-Use Path is a paved path of about 1.2 miles in Clackamas, Oregon, along the Sunrise Expressway. The name comes from OpenStreetMap.

The Sunrise Expressway, called the Sunrise Corridor during construction, is a limited-access highway that extends the Milwaukie Expressway portion of Oregon Route 224 east of Interstate 205 for about two miles. It opened on July 1, 2016, after construction began in 2013, at a cost of $130 million, and a path for bicyclists and pedestrians was built along the highway, according to Wikipedia. Clackamas is an unincorporated community in Clackamas County about 10 miles southeast of downtown Portland.

The mapped path runs roughly east and slightly south along the expressway. No fetched source states its width, hours or manager; the Oregon Department of Transportation and Clackamas County would be the sources to check.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Portland Kgw-Tv, 16.1 km from the trail's middle, 9 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F475056616873808175635246
Low °F373941444953585955484237
Precipitation, in6.44.74.83.62.61.50.40.51.646.67.3
Snow, in1.31.40000000000.9
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Oregon City sheet (1:62,500); the 1954 Gladstone sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Oregon Route 224 — Wikipedia · organization · checked Oct 17, 2026
    Supports: Sunrise Expressway length, 2013 construction start, July 1, 2016 opening, cost, path built along the highway
  3. Clackamas, Oregon — Wikipedia · organization · checked Oct 17, 2026
    Supports: Clackamas as an unincorporated community in Clackamas County about 10 miles southeast of downtown Portland
  4. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: name, paved surface, about 1.2 mile mapped length, direction

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.