Talbot Trail
Greenway in Colorado · OpenStreetMap relation
Runs through New Castle · Garfield County
Conditions now
Loading the weather near New Castle…
Forecast by the National Weather Service for New Castle · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Colorado River Road mile 1.2 · restrooms directions to trailhead 1
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Talbot Trail is a paved bicycle and pedestrian path in New Castle, Colorado, on the south side of the Colorado River. The name and route here come from OpenStreetMap, which maps a single asphalt path of about 2.4 miles under the name, running east and west beside Colorado River Road (County Road 335). Along the way it passes Coal Ridge Park near the Castle Valley Boulevard bridge over the river, and OpenStreetMap shows a parking area on Colorado River Road near the middle of the route.
OpenStreetMap tags the path as designated for both bicycles and pedestrians, with a smooth asphalt surface along its whole length. No page from the Town of New Castle or another public agency describing the trail could be fetched, so its manager, opening date and connections to the rest of the New Castle trail network are not confirmed by an official source.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Rifle Garfield County Airport, 17.9 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 44 55 63 74 86 92 89 80 66 50 37 Low °F 13 20 27 33 40 48 55 54 45 34 23 14 Precipitation, in 0.7 0.6 0.8 1 1.1 0.7 1 1.1 1.3 1.3 0.6 0.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1906 Grand Hogback sheet (1:125,000); the 1962 New Castle sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18133309, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Talbot Trail (way 982936764) — OpenStreetMap · web · checked Oct 17, 2026 Supports: name, length, asphalt cycleway designated for bicycles and pedestrians, alignment beside Colorado River Road (CR 335), proximity to Coal Ridge Park and Castle Valley Boulevard, parking node near the middle
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.