States › Texas

Terry Hershey Extension

Greenway in Texas

Runs through Houston · Harris County

Conditions now

Loading the weather near Houston…

Forecast by the National Weather Service for Houston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Katy Freeway Frontage Road mile 0.1 directions to trailhead 1
  2. Parking at Katy Freeway Frontage Road mile 0.1 directions to trailhead 2
  3. Parking at Katy Freeway Frontage Road mile 0.1 directions to trailhead 3
  4. Parking at Katy Freeway Frontage Road mile 0.1 directions to trailhead 4
  5. Parking mile 0.8 directions to trailhead 5
  6. Parking at Park Row mile 0.8 directions to trailhead 6
  7. Parking mile 0.8 directions to trailhead 7
  8. Parking at Park Row mile 0.8 directions to trailhead 8
The flooded Addics Reservoir (opens in a new tab)
The flooded Addics Reservoir · Photo: CoolMan14015 IZ KOOL! · CC BY-SA 4.0 · Wikimedia Commons

About this trail

Terry Hershey Extension is a paved path of about 1.7 miles (2.7 km) in west Houston, Texas. OpenStreetMap names it Terry Hershey Extension and tags its ways as lit cycleways with bicycles and pedestrians designated. Hiking Project describes the path as connecting the Addicks Park and Ride to Terry Hershey Park: it starts at a traffic light on Park Row at the park and ride, runs east along the toe of the dam, turns south at the dam outlet structure, passes under Park Row and Interstate 10, and ends at the Cardinal Trail in Terry Hershey Park. Harris County Precinct 4 lists Terry Hershey Park at 496 acres, with 11.05 miles of trail, running parallel to a roughly 6-mile stretch of Buffalo Bayou.

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Houston Sugarland Memorial, 18.9 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F646874808792959490837466
Low °F455055606974767672625346
Precipitation, in3.62.83.54.35.24.24.25.34.44.73.83.8
Old maps

USGS topographic maps of the trail's middle go back to the 1915 Addicks sheet (1:24,000); the 1955 Addicks sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Terry Hershey Park — Harris County Precinct 4 · government source · checked Oct 31, 2026
    Supports: park of 496 acres; trail length 11.05 miles; runs parallel to a roughly 6-mile stretch of Buffalo Bayou
  3. Terry Hershey Extension — OpenStreetMap way 636683647 · web · checked Oct 31, 2026
    Supports: name Terry Hershey Extension; highway=cycleway, bicycle=designated, foot=designated, lit=yes, motor_vehicle=no, surface=paved
  4. Terry Hershey Extension — OpenStreetMap way 242605450 · web · checked Oct 31, 2026
    Supports: same name and tags: highway=cycleway, bicycle=designated, foot=designated, lit=yes, motor_vehicle=no, surface=paved
  5. Terry Hershey Extension Trail — Hiking Project · web · checked Oct 31, 2026
    Supports: 1.7 miles (2.7 km); paved path connecting the Addicks Park and Ride to Terry Hershey Park; western access at the Park Row traffic light by the park and ride; runs east along the toe of the dam; turns south at the dam outlet structure; passes under Park Row and Interstate 10; ends at the Cardinal Trail in Terry Hershey Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.