Electric City Trail
Greenway in South Carolina · OpenStreetMap relation
Runs through Northlake and Anderson · Anderson County
Conditions now
Loading the weather near Anderson…
Forecast by the National Weather Service for Anderson · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Beltline Boulevard mile 0.8 directions to trailhead 1
- Parking at West Beltline Boulevard mile 0.8 directions to trailhead 2
- Parking at West Beltline Boulevard mile 0.8 directions to trailhead 3
- Parking at West Beltline Boulevard mile 0.8 directions to trailhead 4
- Parking at West Beltline Boulevard mile 0.8 directions to trailhead 5
- Parking at West Beltline Boulevard mile 0.8 directions to trailhead 6
- Parking at West Beltline Boulevard mile 0.8 directions to trailhead 7
- Parking at West Beltline Boulevard mile 0.9 directions to trailhead 8
- Parking at West Beltline Boulevard mile 0.9 directions to trailhead 9
- Parking at West Beltline Boulevard mile 0.9 directions to trailhead 10
- Parking at West Beltline Boulevard mile 0.9 directions to trailhead 11
- Parking at Hobson Road mile 2 directions to trailhead 12
- Parking at East West Parkway mile 2.1 directions to trailhead 13
- Parking at Highway 81 North mile 3.9 directions to trailhead 14
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Electric City Trail is a paved shared-use path along East West Parkway in Anderson, Anderson County, South Carolina. The name comes from OpenStreetMap; local press calls the path the East West Parkway Trail (and, in 2019, the East West Connector). In 2019 WSPA reported that the South Carolina Department of Transportation would build extensions at both ends with federal money and hand them to the county to maintain.
This record maps about 5.6 miles of the path, from near West Beltline Boulevard and Jim Ed Rice Parkway in the west, along East West Parkway past Hobson Road, to Highway 81 and Oak Hill Drive in the east, where it continues southeast on the pieces OpenStreetMap names the YMCA Segment and AnMed Segment, toward McConnell Springs Road. In April 2021 WSPA described the existing trail as three miles long, from the Clemson Boulevard intersection to near Highway 81, and reported an extension project of more than $5 million, paid with federal guide share money through the Anderson Area Transportation Study. On the west it was to continue past Clemson Boulevard onto Beltline Boulevard, behind Target and Lowe's, to the Anderson Sports and Entertainment Center, with a pedestrian bridge over a creek near Civic Center Boulevard; on the east it was to follow Oak Hill Drive to Harriett Circle and on toward McConnell Springs Road and AnMed Health's North Campus, bringing the total to a little more than six miles. The long-term aim stated in 2019 was a loop from the AnMed north campus through downtown Anderson and back to the Civic Center.
The path is asphalt, about 10 feet wide, and OpenStreetMap marks it for both bicycles and pedestrians; a concrete section at Clemson Boulevard is part of the same line.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
20% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Anderson, 3.7 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 64 73 80 88 91 89 84 74 64 55 Low °F 32 35 41 49 59 67 71 70 64 52 41 35 Precipitation, in 4.6 4.4 4.8 4.1 3.6 4.2 3.8 4.8 3.8 3.3 4 5 Snow, in 0.2 0.3 0.2 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Pickens sheet (1:125,000); the 1957 Anderson sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15962038, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- East West Parkway Trail extension project underway in Anderson Co. — WSPA 7NEWS (April 23, 2021) · web · checked Oct 16, 2026 Supports: current trail three miles from the Clemson Boulevard intersection to near Highway 81; extension over $5 million, federal guide share money through ANATS; route to Beltline Boulevard, behind Target and Lowe's, to the Anderson Sports and Entertainment Center; pedestrian bridge near Civic Center Boulevard; Oak Hill Drive to Harriett Circle, McConnell Springs Road, AnMed Health North Campus; a little more than six miles in total
- Anderson Co. working to expand East West Connector trail — WSPA 7NEWS (August 20, 2019) · web · checked Oct 16, 2026 Supports: 'East West Connector' name; SCDOT builds the extensions with federal money, county maintains them; long-term loop from AnMed's north campus through downtown and back to the Civic Center
- The Electric City Trail, way 242869855 — OpenStreetMap · web · checked Oct 16, 2026 Supports: name The Electric City Trail; asphalt path, width 3.048 m (10 ft), bicycle and foot designated; route along East West Parkway from near Highway 81 and Oak Hill Drive west past Hobson Road; concrete 'Clemson Blvd Segment'; record length about 5.6 miles, from West Beltline Boulevard to the YMCA and AnMed segments
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.