Endless Mountains Trail
Rail-trail in Pennsylvania · OpenStreetMap relation
Runs through Montrose, Bridgewater Township and New Milford Township · Susquehanna County
Conditions now
Loading the weather near Montrose…
Forecast by the National Weather Service for Montrose · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at State Route 706 mile 4.6 directions to trailhead 1
- Parking at State Route 706 mile 5.7 directions to trailhead 2
- Parking at Grow Avenue mile 9.3 directions to trailhead 3
- Parking mile 9.4 directions to trailhead 4
- Parking at Lake Avenue mile 9.4 directions to trailhead 5
- Parking at State Route 1028 mile 9.4 directions to trailhead 6
- Parking at Lanthrop Street mile 9.5 directions to trailhead 7
(opens in a new tab) About this trail
The Endless Mountains Trail is a rail-trail of about 10 miles between Montrose and Alford, Pennsylvania. It follows the former Lackawanna & Montrose Branch of the Delaware, Lackawanna & Western Railroad. That line was built in the 1880s to connect Montrose with Alford, served the area's farming and timber industries, and carried freight and passengers for more than 50 years. The Endless Mountains Visitors Bureau lists the trail as managed by the Rail-Trail Council of NEPA and says it is considered one of the first rail trails in the nation.
The trail starts on Locust Avenue in Montrose Borough and crosses Grow Avenue near the Pump n Pantry. It then runs parallel to Route 706 through Bridgewater Township to Heart Lake, where it turns south and follows Martins Creek and Route 11 toward Alford, crossing Rose Road and running beside an active railroad line into Alford. Locust Street and Grow Avenue in Montrose are popular access points, with Rose Road near the southern section.
Conditions vary. Some sections are rough and uneven, portions near Heart Lake remain blocked, and parts of the trail require a mountain bike. The trail is open to walking, hiking, running, cycling, horseback riding and cross-country skiing, depending on conditions.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Montrose, 4.5 km from the trail's middle, 49 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 33 41 55 67 75 80 79 71 59 47 36 Low °F 12 13 21 32 42 52 56 54 46 36 27 19 Precipitation, in 3.4 2.8 3.6 4.1 4.3 4.6 4.6 3.8 4.5 4.1 3.3 3.6 Snow, in 20.6 15.9 18.6 4.5 0.2 0 0 0 0 0.5 7.5 14.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Montrose sheet (1:62,500); the 1968 Montrose East sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10939115, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Endless Mountains Trail — Endless Mountains Visitors Bureau · organization · checked Oct 14, 2026 Supports: 10-mile rail trail from Montrose to Alford, managed by the Rail-Trail Council of NEPA, one of the first rail trails in the nation, Locust Avenue start, Grow Avenue crossing, Route 706 through Bridgewater Township, Heart Lake, Martins Creek and Route 11 toward Alford, mountain bike needed in parts, walking, hiking, running and cycling
- Endless Mountains Trail — Discover NEPA · web · checked Oct 14, 2026 Supports: Lackawanna & Montrose Branch of the DL&W, built in the 1880s, farming and timber, more than 50 years of freight and passengers, Rose Road, active railroad into Alford, access points, rough sections and blockages near Heart Lake, horseback riding and cross-country skiing
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.