States › Tennessee

Thompson's Station Greenway

Greenway in Tennessee

Runs through Thompson's Station · Williamson County

Conditions now

Loading the weather near Thompson's Station…

Forecast by the National Weather Service for Thompson's Station · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
2.1 mi 3.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 2 directions to trailhead 1
  2. Parking mile 2.1 directions to trailhead 2
Thomas L. Critz House, beside the trail (opens in a new tab)
Thomas L. Critz House, beside the trail · Photo: rossograph · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Thompson's Station Greenway is a paved multi-use trail in the town of Thompson's Station, Williamson County, Tennessee. It is a greenway, not a rail-trail. The Town of Thompson's Station builds it in phases as a long-term plan to link the town's major subdivisions and schools with more than 300 acres of park land and the Town Center, and to give residents another way to get around. Each phase has been paid for partly with grants; in September 2019 the town received a $1.29 million Transportation Alternatives Program grant for the third phase. Kimley-Horn designed the trail with the town's Community Development Department.

Phase 1, completed in 2014, runs from the western edge of Tollgate Village south past the Nutro Dog Park and community gardens to the CSX railroad undercrossing. The town describes Phase 2 as continuing from the CSX undercrossing through Preservation Park to Thompson's Station Road West. Phase 3 starts near Thompson's Station Middle School, runs north to the Fields of Canterbury subdivision and connects west to the Nutro Dog Park, passing under Columbia Pike (US 31) through an undercrossing built with the Tennessee Department of Transportation during the road's widening. The town announced the opening of Phase 3 on May 12, 2026, with a celebration at Nutro Dog Park on May 19.

The line on this page is about 2.1 miles. OpenStreetMap maps it as an asphalt path open to bicycles and pedestrians, with short tunnels including the one under Columbia Pike, and shows parking at the Nutro Dog Park.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Thompson Stn, 6.9 km from the trail's middle, 9 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485161717987898984736151
Low °F283239475766696962493832
Precipitation, in4.65.255.35.14.64.63.64.13.84.25.8
Snow, in1.21.50.5000000000.3
Old maps

USGS topographic maps of the trail's middle go back to the 1909 Franklin sheet (1:62,500); the 1949 Spring Hill sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Thompson's Station Greenway | Town of Thompson's Station, TN · government source · checked Oct 15, 2026
    Supports: purpose (linking subdivisions, schools, 300+ acres of park land and Town Center); grants for each phase; $1.29 million TAP grant awarded September 16, 2019; Kimley-Horn design with the Community Development Department; Phase 1 completed 2014 and its route; Phase 2 route; Phase 3 route and Columbia Pike undercrossing built with TDOT
  3. Greenway Grand Opening Celebration | Town of Thompson's Station, TN · government source · checked Oct 15, 2026
    Supports: May 12, 2026 announcement of Phase 3 opening; celebration at Nutro Dog Park on May 19
  4. Thompson's Station Greenway (way 1481029421) — OpenStreetMap · web · checked Oct 15, 2026
    Supports: asphalt surface, bicycle and foot access, tunnels including under Columbia Pike, parking at Nutro Dog Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.