States › Alabama

Three Mile Creek Greenway

Greenway in Alabama

Runs through Mobile · Mobile County

Conditions now

Loading the weather near Mobile…

Forecast by the National Weather Service for Mobile · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Hawthorn House, beside the trail (opens in a new tab)
Hawthorn House, beside the trail · Photo: Altairisfar · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Three Mile Creek Greenway Trail is a planned 6.5-mile linear park along Three Mile Creek in Mobile, Alabama, built in phases by the City of Mobile. The city describes it as the first major piece of the Mobile Greenway Initiative and says the community advocated for it for 35 years. The creek's watershed covers about 30 square miles and the creek served as a drinking water source from as early as 1814.

Two of seven segments were complete in the city's September 2026 status update. Segment 1 at the Japanese Gardens opened on August 20, 2025. The University Hospital Connector is the section the city unveiled in June 2024: just over half a mile from Tricentennial Park to University Hospital, with an 80-foot pedestrian bridge and solar lights. Segments to Bush Park and Mill Street Park, and along MLK Jr. Avenue, were in design or pre-construction, and the I-65 Connector, the final link, was awaiting funding.

This record maps about 1.5 miles of built path. Planned features include parking, pavilions, bicycle repair stations, benches and pedestrian bridges, and the city's Parks and Recreation department stewards the existing trail land.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

44% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February, April to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Mobile Dwtn Airport, 9.2 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F626672788590929289817264
Low °F424652596673757572615045
Precipitation, in5.23.85.14.94.45.86.67.14.53.84.15.3
Old maps

USGS topographic maps of the trail's middle go back to the 1922 Mobile sheet (1:62,500); the 1953 Mobile sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Three Mile Creek Greenway Trail (OFFICIAL) - Map for Mobile (City of Mobile) · organization · checked Oct 18, 2026
    Supports: 6.5-mile linear park, phased construction, segment status, Segment 1 opened August 20, 2025, 35 years of advocacy, 1814 drinking water, 30-square-mile watershed, design elements, Mobile Greenway Initiative
  3. New portion of Three Mile Creek Greenway Trail unveiled - FOX10 News (WALA) · web · checked Oct 18, 2026
    Supports: June 2024 unveiling, just over half a mile from Tricentennial Park to University Hospital, 80-foot bridge, solar lights

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.