States › Alabama

Toll Gate Greenway

Greenway in Alabama

Runs through Huntsville · Madison County

Conditions now

Loading the weather near Huntsville…

Forecast by the National Weather Service for Huntsville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.2 mi 2.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Bankhead Trailhead mile 0 directions to Bankhead Trailhead
  2. Land Trust of North Alabama: Monte Sano Nature Preserve mile 0 · restrooms directions to Land Trust of North Alabama: Monte Sano Nature Preserve
  3. Cold Springs Nature Trail mile 1.1 directions to Cold Springs Nature Trail
  4. Trailhead at Bankhead Parkway Northeast mile 1.2 directions to trailhead 4
Alluring Pathway (opens in a new tab)
Alluring Pathway · Photo: Monochrome · CC BY · Flickr

About this trail

Toll Gate Greenway, which the Land Trust of North Alabama writes as Tollgate Greenway, is a paved, multi-use path of 1.2 miles (2.0 km) on Monte Sano in Huntsville, Alabama. It follows a segment of the historic Toll Gate Road along the mountain's western slope. The Land Trust built it with the City of Huntsville and Monte Sano State Park as partners. Construction began in September 2025 and a stick-cutting ceremony was held April 27, 2026.

The greenway starts at the Land Trust's Bankhead Trailhead and runs uphill to the closed section of Bankhead Parkway, where riders and hikers can link to High Trail. The Land Trust gives a round trip of 2.4 miles. The City of Huntsville's earlier release put the route at 1.3 miles from the trailhead to Fearn Street and described a 10-foot-wide asphalt pathway.

The cost was about $1 million: the Land Trust raised $500,000 and the city matched it with $500,000. The city said it wanted cyclists to use the path instead of Bankhead Parkway, and the Land Trust describes smooth pavement, shaded sections and benches.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

82% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Owens Cross Roads 3s, 23.3 km from the trail's middle, 240 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505563717886888884746253
Low °F303239465664686659473632
Precipitation, in5.95.55.55.14.94.54.23.74.23.74.56.2
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Huntsville sheet (1:125,000); the 1950 Huntsville sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Huntsville teams with Land Trust of North Alabama to pave Monte Sano recreational trail — City of Huntsville · government source · checked Oct 17, 2026
    Supports: 1.3 miles to Fearn Street, 10-foot asphalt, $1 million cost with matching funds, cyclists encouraged to use it instead of Bankhead Parkway
  3. Tollgate Greenway officially opens on Monte Sano — Land Trust of North Alabama · organization · checked Oct 17, 2026
    Supports: 1.2 miles, paved multi-use, April 27 2026 ceremony, start at Bankhead Trailhead, closed section of Bankhead Parkway, High Trail link, 2.4-mile round trip, partners, funding, open to cyclists, benches and shade
  4. Tollgate Greenway — Land Trust of North Alabama · organization · checked Oct 17, 2026
    Supports: follows a segment of historic Toll Gate Road on the western slope; construction set for September 2025
  5. OpenStreetMap way 130211639 — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: name Toll Gate Greenway, cycleway designated for bicycles, asphalt, opening_date 2026-03-09

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.