Town Creek Hike and Bike Trail
Greenway in Texas
Runs through Weatherford · Parker County
Conditions now
Loading the weather near Weatherford…
Forecast by the National Weather Service for Weatherford · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South Walnut Street mile 0 directions to trailhead 1
- Parking at Fort Worth Highway mile 0 directions to trailhead 2
- Parking at Ikard Lane mile 2.6 directions to trailhead 3
- Parking at Ikard Lane mile 2.6 directions to trailhead 4
(opens in a new tab) About this trail
The Town Creek Hike and Bike Trail is a paved trail of the City of Weatherford, in Parker County, Texas, following Town Creek rather than a railroad. The first section was registered with the Texas Department of Licensing and Regulation as a $3.85 million public project, owned by the city and designed by Graham Associates, with construction from June 2010 to February 2012 covering grading, concrete pavement, signs and bridges. The Weatherford Democrat dates the city's connected trail network to 2011.
In early December 2024 city leaders, Weatherford College and chamber of commerce members cut the ribbon on a three-quarter-mile paved stretch across the Weatherford College campus to Austin Elementary, the third piece of the network, which brought the trail to a little more than five miles. It was paid for by a $1.2 million Texas Department of Transportation grant obtained through the North Central Texas Council of Governments, with the city contributing $240,000, or 20 percent; Weatherford ISD and the college were also partners. The city is planning a link from Weatherford to the existing trail to the state park at Mineral Wells.
This record maps about 3.1 miles in several pieces, from near South Walnut Street and Fort Worth Highway southeast to Ikard Lane, where OpenStreetMap shows parking.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
9% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Weatherford, 0.6 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 60 68 76 82 90 95 95 88 78 66 58 Low °F 32 36 44 51 61 69 73 72 64 52 42 34 Precipitation, in 2 2.5 3 2.7 4.4 3.9 1.9 2.6 3.2 3.8 3 2.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Weatherford sheet (1:125,000); the 1959 Weatherford North sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Lake Mineral Wells State Trailway 2.7 mi away · 20.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- TDLR TABS Project Details: Town Creek Hike and Bike Trail (EABPRJB0806992) — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: City of Weatherford owner, Parker County, $3,852,180 estimated cost, Graham Associates, June 2010 to February 2012 construction, grading, concrete pavement, signs and bridges
- New stretch of Town Creek Hike and Bike Trail links Weatherford College to namesake city — Weatherford Democrat · web · checked Oct 15, 2026 Supports: December 2024 ribbon cutting, three-quarter-mile stretch from the college to Austin Elementary, third piece of a network begun in 2011, trail a little more than five miles, $1.2 million TxDOT grant via NCTCOG, $240,000 (20 percent) city share, partners, planned link to the trail to Mineral Wells State Park
- OpenStreetMap ways for this trail · web · checked Oct 15, 2026 Supports: mapped length and parking at Ikard Lane
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.