Turkey Creek Greenway
Greenway in Tennessee
Runs through Farragut and Morristown · Knox and Hamblen counties
Conditions now
Loading the weather near Morristown…
Forecast by the National Weather Service for Morristown · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Pleasant Avenue mile 0.4 directions to trailhead 1
- Parking at South Jackson Street mile 0.5 directions to trailhead 2
- Parking at Rosedale Avenue mile 0.5 directions to trailhead 3
- Parking at South Jackson Street mile 0.6 directions to trailhead 4
- Parking at Peavine Alley mile 0.9 directions to trailhead 5
- Parking at South Mill Street mile 0.9 directions to trailhead 6
- Parking at North Cumberland Street mile 1.5 directions to trailhead 7
- Trailhead at Bobolink Road directions to trailhead 8
- Trailhead at Banbury Road directions to trailhead 9
- Parking at Willingham Drive directions to trailhead 10
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
This record joins two unrelated paved paths named Turkey Creek Greenway, about 55 miles apart in East Tennessee. The longer piece, about 1.9 miles as mapped, is the Town of Farragut's greenway beside Turkey Creek Road in western Knox County. The shorter, about 1.2 miles, is the City of Morristown's greenway along Turkey Creek through downtown Morristown in Hamblen County. OpenStreetMap maps both as asphalt paths designated for bicycles and pedestrians, and gives one Farragut segment the alternate name Iverness Greenway.
Farragut's greenway ends 1,850 feet west of Brixworth Boulevard. In September 2023 the Board of Mayor and Aldermen voted 4-1 to hire LDA Engineering to design an extension from there to Virtue Road, and the Town engineer said the completed link would connect by sidewalk through the Sheffield subdivision to the Little Turkey Creek Greenway, whose newest section opened in March 2024. After objections from residents along Turkey Creek Road, the Farragut Municipal Planning Commission deferred the preliminary plans in May 2024, and in July 2024 residents sued the Town in Knox Chancery Court over the threat of eminent domain. The budget passed on first reading in June 2025 kept $500,000 for Turkey Creek Road multi-modal improvements, and in April 2026 the Town had placed Turkey Creek Road in its 2026 Capital Investments Program.
Morristown has built its greenway in phases. In 2015 the state awarded the city a $700,805 transportation alternatives grant, administered by the Tennessee Department of Transportation, for Phase 5: nearly 6,000 feet of 10-foot-wide asphalt path from the Freddie Kyle Trail trailhead at Cherokee Drive north to the Wildwood Park trailhead, laid in the abandoned Peavine railroad right-of-way with three crosswalks and two small bridges over Turkey Creek. OpenStreetMap shows parking near the path on South Jackson Street, South Mill Street, Peavine Alley and North Cumberland Street.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lenoir City, 12.5 km from the trail's middle, 15 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 49 53 62 71 79 86 89 88 84 73 61 52 Low °F 28 31 37 46 55 64 68 67 60 48 37 31 Precipitation, in 5 5.2 5.1 5.2 4.3 4.2 5.1 3.8 4.2 3 4.1 5.9 Snow, in 1.6 1.3 0.6 0 0 0 0 0 0 0 0.1 0.4 - On the National Register
- Morristown College Historic District, Morristown · historic district, listed 1983
- Old maps
USGS topographic maps of the trail's middle go back to the 1895 Loudon sheet (1:125,000); the 1953 Concord sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Concord Greenway 0.5 mi away · 2.5 mi, paved
- McFee Greenway 1.0 mi away · 1.5 mi, paved
- Grigsby Chapel Greenway 1.8 mi away · 1.8 mi, paved
- Everett Greenway 2.2 mi away · 1.4 mi, paved
- Parkside Greenway 2.3 mi away · 2.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Turkey Creek greenway vs. property rights argued: BOMA votes 4-1 (October 4, 2023) — Farragut Press · press · checked Oct 15, 2026 Supports: western terminus 1,850 feet west of Brixworth Boulevard; Sept. 28, 2023 4-1 vote to contract LDA Engineering to design the extension to Virtue Road; residents' objections
- Homeowners willing to fight 'front yard' greenway path (May 22, 2024) — Farragut Press · press · checked Oct 15, 2026 Supports: Planning Commission deferred preliminary plans May 16, 2024; extension to Sheffield subdivision and Virtue Road; connection by sidewalk through Sheffield subdivision to the Little Turkey Creek Greenway
- Little Turkey Creek Greenway opening extends Farragut's walking enjoyment (March 27, 2024) — Farragut Press · press · checked Oct 15, 2026 Supports: Little Turkey Creek Greenway extension opened March 19, 2024
- Two 'no' votes to FY Budget 1st read; greenway issue (June 18, 2025) — Farragut Press · press · checked Oct 15, 2026 Supports: $500,000 for Turkey Creek Road Multi-Modal Improvements in the 2025-2026 budget passed on first reading June 12, 2025; pending litigation
- Concerns mount over greenways, property use and Town (April 8, 2026) — Farragut Press · press · checked Oct 15, 2026 Supports: lawsuit filed in Knox Chancery Court in July 2024 over the threat of eminent domain; Turkey Creek Road in the Town's 2026 Capital Investments Program
- Turkey Creek Greenway (way 354904790 and adjoining ways 710615519–710615522) — OpenStreetMap · web · checked Oct 15, 2026 Supports: Farragut segment: name, alternate name Iverness Greenway, asphalt cycleway designated for bicycles and pedestrians beside Turkey Creek Road; mapped length about 1.9 miles; Knox County (TIGER county tags)
- Turkey Creek Greenway (way 585723953 and adjoining ways 911068445, 962943235, 977102639–977102659) — OpenStreetMap · web · checked Oct 15, 2026 Supports: Morristown segment: name, asphalt cycleway designated for bicycles and pedestrians along Turkey Creek; mapped length about 1.2 miles; Hamblen County; parking near South Jackson Street, South Mill Street, Peavine Alley and North Cumberland Street
- Haslam announces transportation grant for Morristown greenways (June 15, 2015) — WATE · web · checked Oct 15, 2026 Supports: $700,805 transportation alternative grant for Phase 5 of Morristown's Turkey Creek Greenway, administered by TDOT; nearly 6,000 feet of 10-foot-wide asphalt path from the Freddie Kyle Trail trailhead at Cherokee Drive north to the Wildwood Park trailhead; abandoned Peavine railroad right-of-way; three crosswalks and two small bridges across Turkey Creek
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.