UL Bike Trail
Greenway in Louisiana
Runs through Lafayette · Lafayette Parish
Conditions now
Loading the weather near Lafayette…
Forecast by the National Weather Service for Lafayette · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Johnston Street mile 0.1 directions to trailhead 1
- Parking at Glynn Abel Drive mile 0.8 directions to trailhead 2
- Parking at Cajundome Boulevard mile 0.9 directions to trailhead 3
- Parking at Cajundome Boulevard mile 1.1 directions to trailhead 4
Plan your visit
- By trainAmtrak: Lafayette, LA (LFT) 1.4 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The UL Bike Trail is a path of about 1.9 miles in Lafayette, Louisiana, built by the University of Louisiana at Lafayette. It follows Cajundome Boulevard through University Research Park, from near the Ira Nelson Horticulture Center on Johnston Street to Eraste Landry Road. A university news release of January 2012 reported the two-mile path open; a 2013 release dates its opening to fall 2011.
A $1 million federal transportation enhancement grant paid for construction. Architecture students in the university's Community Design Workshop designed the path, and the university described it as a first phase meant to link the main campus with the University Commons area. A 2013 release reported that Lafayette Consolidated Government planned to extend it about 1.25 miles to East Lewis Street, using a $507,000 Federal Transit Administration grant; the sources read do not say whether that extension was finished.
OpenStreetMap, the source of the name and the mapped route, records the trail as a greenway; no source read states the surface or the current manager.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to March, May and November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lafayette, 2.5 km from the trail's middle, 3 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 62 66 72 78 85 90 91 92 88 81 71 64 Low °F 41 45 51 57 65 72 73 73 68 58 48 43 Precipitation, in 6.1 4.5 3.8 5.5 4.9 7 6.3 6.5 5.2 5 4.8 5.2 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1946 Lafayette sheet (1:31,680); the 1955 Lafayette sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- UL Lafayette Cuts Ribbon On New Bike Path - University of Louisiana at Lafayette · organization · checked Oct 18, 2026 Supports: two-mile length, route along Cajundome Boulevard, endpoints, $1 million grant, student design, January 2012 opening
- Bike Path Extension to Link Main Campus and University Common - University of Louisiana at Lafayette · organization · checked Oct 18, 2026 Supports: fall 2011 opening, planned 1.25-mile extension and its funding
- OpenStreetMap ways for this trail - OpenStreetMap contributors · web · checked Oct 18, 2026 Supports: trail name, mapped length and greenway classification
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.