Uptown Greenway
Greenway in Wisconsin · OpenStreetMap relation
Runs through Fitchburg · Dane County
Conditions now
Loading the weather near Fitchburg…
Forecast by the National Weather Service for Fitchburg · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by City of Fitchburg.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at East Cheryl Parkway mile 1 directions to trailhead 1
- Parking at Lacy Road mile 1 directions to trailhead 2
- Parking at Lacy Road mile 1 directions to trailhead 3
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Uptown Greenway is a bicycle route in Fitchburg, Wisconsin. OpenStreetMap maps it as a local cycle route operated by the City of Fitchburg, with the reference Uptown and a stated distance of 1.6 miles. Fitchburg has more than 36 miles of multi-use paths, according to a 2022 report on a proposed Fitchburg Greenway System, which Bike Fitchburg put forward and the city's park commission and bicycle committee approved in concept. That report does not mention the Uptown Greenway.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Uw Arboretum - Madison, 5.2 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 28 32 44 57 69 78 82 81 74 61 46 33 Low °F 11 14 25 36 47 57 61 59 51 39 28 18 Precipitation, in 1.7 1.7 2.3 4.2 4.5 5.7 4.7 4.1 3.9 3 2.3 1.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 Madison sheet (1:62,500); the 1959 Madison West sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Lacy Greenway within 0.2 mi · 4.8 mi, paved
- Cheryl Greenway within 0.2 mi · 2.2 mi, paved
- Syene Greenway within 0.2 mi · 1.4 mi, paved
- Terravessa Greenway 0.5 mi away · 1.7 mi, paved
- Capital City State Trail 0.6 mi away · 15.8 mi, paved
- Nobel Greenway 1.0 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12172805, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- OpenStreetMap contributors (ways and tags for this trail) · web · checked Oct 18, 2026 Supports: route relation name, operator City of Fitchburg, ref Uptown, 1.6 mi distance, local cycle network
- AARP: Fitchburg greenway system plan wins Small Dollar, Big Impact grant — WisPolitics · web · checked Oct 18, 2026 Supports: over 36 miles of multi-use paths, proposed Fitchburg Greenway System, Bike Fitchburg, park commission and bicycle committee approval (July 2022)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.