Utah and Salt Lake Canal Trail
Canal towpath in Utah
Runs through Magna and West Valley City · Salt Lake County
Conditions now
Loading the weather near West Valley City…
Forecast by the National Weather Service for West Valley City · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Utah and Salt Lake Canal Trail is a paved path beside the Utah and Salt Lake Canal in West Valley City and Magna, on the west side of Salt Lake County, Utah. Cycling West reported in 2013 that Salt Lake County was leading the planning and construction of the trail on a canal maintenance road, with grant money from the county and West Valley City. The first segment, from 4800 West to 5600 West, was scheduled for completion in October 2013; the plan carried the trail from about 4000 West and 4700 South to the Mountain View Corridor Trail and west to 8400 West.
TrailLink lists the trail at 4.9 miles of asphalt from Molly Court in Magna east to Midway Drive in West Valley City, between the canal and rows of houses, with connections to schools and parks. On the west it runs along the edge of Woodledge Park, and at the east end a concrete path continues from Midway Drive to Weckler Memorial Park, a linear park along 4715 South. There is no dedicated parking, and TrailLink reports that the trail is closed in winter.
This record, about 2.7 miles as mapped in OpenStreetMap, covers the western part of the trail, from near Molly Drive in Magna east to the Mountain View Corridor Trail, where OpenStreetMap shows the trail meeting the path beside the Mountain View Corridor highway.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Garfield, 12.5 km from the trail's middle, 49 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 42 53 60 71 82 91 89 78 63 48 37 Low °F 25 29 37 43 53 62 71 69 59 46 34 26 Precipitation, in 1.4 1.4 1.8 2.3 2.4 1 0.7 0.7 1.1 1.6 1.6 1.6 Snow, in 5.6 2.9 2.2 0.4 0 0 0 0 0 0.1 3.9 7.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1885 Tooele Valley sheet (1:250,000); the 1952 Magna sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
- 360° view 1 of 3, photo by flug32
- 360° view 2 of 3, photo by flug32
- 360° view 3 of 3, photo by flug32
Nearby trails
- Mountain View Connector Trail within 0.2 mi · 18.5 mi, paved
- Mountain View Corridor Trail 0.3 mi away · 4.3 mi, paved
- Golden Spoke Trail Network 4.4 mi away · 74.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- West Valley City Constructing 2 New Paved Bike Trails — Cycling West (2013) · web · checked Oct 17, 2026 Supports: Salt Lake County lead, county and West Valley City grants, canal maintenance road, first segment 4800 West to 5600 West due October 2013, planned extent to the Mountain View Corridor Trail and 8400 West
- Utah and Salt Lake Canal Trail — TrailLink · web · checked Oct 17, 2026 Supports: 4.9 miles, asphalt, Molly Court to Midway Drive, setting, Woodledge Park, Weckler Memorial Park connection, no dedicated parking, winter closure
- OpenStreetMap ways named Utah and Salt Lake Canal Trail — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: mapped length and extent from Molly Drive to the Mountain View Corridor Trail
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.