Veterans Memorial Trail
Rail-trail in Indiana
Runs through Hebron · Porter County
Conditions now
Loading the weather near Hebron…
Forecast by the National Weather Service for Hebron · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Tower Crossing mile 0 directions to trailhead 1
- Parking at West Wilson Street mile 0.3 directions to trailhead 2
(opens in a new tab) About this trail
The Veterans Memorial Trail in Hebron, Indiana, is a 0.9-mile asphalt multi-use trail built by the Town of Hebron with the help of a $302,956 Next Level Trails grant from the state. It runs parallel to U.S. 231 from Tower Crossing on the west side of Hebron to the Lake/Porter county line, following an abandoned rail corridor. A ribbon cutting on June 6, 2020, National Trails Day, marked its completion as one of the first Next Level Trails projects to open. U.S. 231 is also called the Veterans Memorial Parkway for the war memorials built or planned along it, and the trail in Hebron is to be the site of a planned Northwest Indiana Middle East Memorial dedicated to veterans of the wars in Iraq and Afghanistan.
The Hebron section is part of a regional effort to connect Hebron to Crown Point along the U.S. 231 corridor, and it lies on the planned routes of the American Discovery Trail and the Great American Rail-Trail; the Rails-to-Trails Conservancy counted it, with the Pennsy Greenway extension in Schererville, among the first new miles added to the Great American Rail-Trail in Indiana after that route was announced in May 2019. A section of the Veterans Memorial Trail opened in Crown Point on November 14, 2025. In May 2024 a Northwestern Indiana Regional Planning Commission planner said the trail had been on the books for 25 years with only about two miles built on either end; Lake County Parks had secured another $500,000 for right-of-way acquisition and hoped to build from the county line toward Leroy.
The mapped Hebron section is paved, with parking at Tower Crossing and near West Wilson Street.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Lowell, 18.5 km from the trail's middle, 9 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 36 47 60 71 81 84 82 77 64 49 37 Low °F 15 18 27 38 49 59 62 60 52 41 30 21 Precipitation, in 2.3 1.9 2.3 3.7 4.2 5.1 4.3 4.3 3.3 3.6 2.6 2.2 Snow, in 9.7 9.3 3.4 0.3 0 0 0 0 0 0.2 0.9 5.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1953 Hebron sheet (1:24,000); the 1969 Hebron sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Veterans Memorial Trail Opens in Hebron — State of Indiana (June 8, 2020) · government source · checked Oct 15, 2026 Supports: 0.9-mile asphalt multi-use trail, Town of Hebron, $302,956 Next Level Trails grant, June 6 ribbon cutting on National Trails Day, one of the first projects to open, route parallel to U.S. 231 from Tower Crossing to the Lake/Porter county line on an abandoned rail corridor, Veterans Memorial Parkway, planned Middle East memorial, Hebron to Crown Point effort, American Discovery Trail and Great American Rail-Trail
- Next Level Trails Progress & News — Indiana Department of Natural Resources · government source · checked Oct 15, 2026 Supports: Veterans Memorial Trail opening in Crown Point on November 14, 2025
- New Trail Will Connect Indiana To Cross-Country Route — WFYI / Associated Press (June 15, 2020) · organization · checked Oct 15, 2026 Supports: Rails-to-Trails Conservancy statement that this segment and the Pennsy Greenway extension in Schererville were the first new Great American Rail-Trail miles in Indiana since the May 2019 announcement
- Planning continues for future trail connections — Lakeshore Public Media (May 17, 2024) · organization · checked Oct 15, 2026 Supports: 25 years on the books, about two miles built on either end, $500,000 for right-of-way acquisition, Lake County Parks plans toward Leroy
- Way: Veterans Memorial Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: paved surface; parking at Tower Crossing and near West Wilson Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.