Vietnam Veterans Memorial Recreational Trail
Greenway in New York
Runs through Calverton and Riverhead · Suffolk County
Conditions now
Loading the weather near Calverton…
Forecast by the National Weather Service for Calverton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at River Road mile 1.3 directions to trailhead 1
- Parking at River Road mile 1.5 directions to trailhead 2
- Parking at River Road mile 1.7 directions to trailhead 3
- Parking at Middle Country Road mile 4.4 directions to trailhead 4
- Parking at Middle Country Road mile 5 directions to trailhead 5
- Parking at Middle Country Road mile 6.5 directions to trailhead 6
- Parking at Grumman Boulevard mile 8 directions to trailhead 7
- Parking at Grumman Boulevard mile 8.8 directions to trailhead 8
- Parking at Grumman Boulevard mile 8.9 directions to trailhead 9
- Parking at Grumman Boulevard mile 9.1 directions to trailhead 10
(opens in a new tab) About this trail
The Vietnam Veterans Memorial Trail, also called the Vietnam Veterans Memorial Recreation Trail, is a paved, non-motorized loop around most of the perimeter of the former Grumman facility at Calverton Enterprise Park (EPCAL), in the Town of Riverhead, New York. It is not a rail trail: it follows the perimeter security road that the Grumman Corporation cleared and developed in the 1950s. The Town of Riverhead manages the trail, and the town's Alternative Transportation Committee led its development. The trail is named for and dedicated to Vietnam veterans.
Work began in 2008, when a $100,000 state grant paid for the first 3.2 miles. By 2016 the town had paved a further three-mile stretch, while a disagreement over the Line Road section, which crossed two proposed subdivision lots and the southwest corner of the 7,000-foot runway, delayed completion. Officials broke ground on June 8, 2018, on a four-mile extension over an abandoned gravel road, funded with $200,000 from Suffolk County and $500,000 from the state Environmental Protection Fund. The work required an easement from the Navy, railroad crossings and state Department of Environmental Conservation approval under the Wild, Scenic and Recreational Rivers program; the committee spent about seven years on the permits. The extended trail opened on July 1, 2019.
RiverheadLOCAL gave the trail's length as 8.9 miles in 2016 and 9.2 miles at the 2019 opening, when a town councilwoman described it as a continuous 10-mile loop; this record maps 9.3 miles. The trail is used for walking, jogging and bicycling away from road traffic. In 2016 parts of the Line Road section still needed a base layer, new pavement and crack sealing.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Baiting Hollow, 5.3 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 40 47 57 68 77 83 81 75 64 53 43 Low °F 22 23 29 38 47 56 63 62 55 44 35 27 Precipitation, in 3.8 2.7 5 4.2 3.7 4 3.3 3.8 4.3 4.7 3.9 5.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1904 Moriches sheet (1:62,500); the 1957 Wading River sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/newyork
Nearby trails
- North Shore Rail Trail 2.1 mi away · 10.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- EPCAL recreation trail officially opens (July 1, 2019) — RiverheadLOCAL · web · checked Oct 14, 2026 Supports: name Vietnam Veterans Memorial Recreation Trail and dedication to Vietnam veterans; loop on the security road around most of the former Grumman facility perimeter; 2008 start with first 3.2 miles on a $100,000 grant; Navy easement, railroad crossings, DEC Wild, Scenic and Recreational Rivers approval; $500,000 Environmental Protection Fund grant; opening July 1, 2019; 9.2 miles and 'continuous 10-mile loop'; walking, jogging and biking; Alternative Transportation Committee
- Officials break ground on four-mile extension of EPCAL recreation trail (June 8, 2018) — RiverheadLOCAL · web · checked Oct 14, 2026 Supports: groundbreaking June 8, 2018; four-mile non-motorized extension over an abandoned gravel vehicular path; path cleared and developed by Grumman in the 1950s as a perimeter security road; multi-purpose paved trail; $200,000 Suffolk County and $500,000 Environmental Protection Fund; about seven years on DEC permits
- With funds coming to finish paving EPCAL bike path, disagreement over final location threatens to delay completion (July 26, 2016) — RiverheadLOCAL · web · checked Oct 14, 2026 Supports: 8.9-mile loop around the former Grumman site; Town of Riverhead management; three-mile unpaved stretch paved; Line Road dispute over two subdivision lots and the southwest corner of the 7,000-foot runway; Line Road needing base layer, new pavement and crack sealing
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.