States › Virginia

Virginia Creeper Trail

Rail-trail in Virginia · OpenStreetMap relation

Runs through Abingdon and Damascus · Washington County

Conditions now

Loading the weather near Damascus…

Forecast by the National Weather Service for Damascus · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Virginia Creeper Trail is a 35-mile (56 km) multi-purpose rail trail. Located in southwestern Virginia, the trail runs from Abingdon to Whitetop, Virginia, near Mount Rogers National Recreation Area and the North Carolina state line.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
16.7 mi 26.9 km1
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Bank Street mile 1.1 directions to trailhead 1
  2. Parking at East Creepers Way mile 1.1 directions to trailhead 2
  3. Parking at West Bank Street mile 1.3 · restrooms directions to trailhead 3
  4. Parking at South Smith Street mile 1.3 · restrooms directions to trailhead 4
  5. Parking at Alvarado Road mile 8.1 · restrooms directions to trailhead 5
  6. Virginia Creeper Trail Parking mile 8.2 · restrooms directions to Virginia Creeper Trail Parking
  7. Virgina Creeper Trail Parking mile 12.9 · restrooms directions to Virgina Creeper Trail Parking
  8. Virginia Creeper Trail Parking mile 13 · restrooms directions to Virginia Creeper Trail Parking
  9. Virginia Creeper Trail: Watauga Trail Head mile 13 · restrooms directions to Virginia Creeper Trail: Watauga Trail Head
  10. Virginia Creeper Trail Parking mile 16.7 · restrooms directions to Virginia Creeper Trail Parking
  11. Virginia Creeper Trail Parking mile 16.8 directions to Virginia Creeper Trail Parking
  12. Virginia Creeper Trail: Abingdon Trail Head mile 16.8 · restrooms directions to Virginia Creeper Trail: Abingdon Trail Head
Creepertrail2.jpg (opens in a new tab)
Creepertrail2.jpg · Photo: Metayel · Public domain · Wikimedia Commons

About this trail

The Virginia Creeper Trail is a 34.3-mile rail-trail in southwestern Virginia between Abingdon, Damascus and Whitetop Station; the 16.8 miles mapped here cover the section from Abingdon to Damascus. It follows the Virginia-Carolina Railroad, built in the early 1900s to haul timber, which Norfolk & Western had acquired by 1919 as its Abingdon Branch; the name came from trains creeping up its steep grades. Passenger service ended in 1962 and the last train ran on March 31, 1977. The U.S. Forest Service bought the corridor above Damascus, and in 1982 the towns of Abingdon and Damascus bought the 13 miles between them. The trail was dedicated as a National Recreation Trail in June 1987 and opened to Whitetop Station in 1989. The Forest Service, the two towns and volunteers of the Virginia Creeper Trail Conservancy maintain it.

From the Abingdon trailhead, which has parking, restrooms and a locomotive display, the trail passes Dry Branch Trestle and crosses the junction of the South and Middle Forks of the Holston River on the curving South Holston trestle, its lowest point, before passing Alvarado and reaching Damascus. Above Damascus it enters the Mount Rogers National Recreation Area, passing Straight Branch, Taylor's Valley, Creek Junction, the 550-foot High Trestle and the Green Cove and Whitetop Station visitor centers, and ends near the Virginia-North Carolina line. The upper section climbs 1,600 feet, at grades up to nearly 7 percent.

The trail is for non-motorized use, including cycling, hiking and horseback riding. Hurricane Helene destroyed 17 miles between Damascus and Whitetop in September 2024, damaging 30 of the trail's 31 historic trestles. The Forest Service awarded a $240 million contract to Kiewit to rebuild that stretch, construction began in December 2025, and the full trail is scheduled to reopen on March 31, 2027. The trail remains open from Abingdon to Trestle 16 in Damascus.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 85% of this route as a trail on former railroad right-of-way.

Shade

57% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Abingdon 3s, 6.8 km from the trail's middle, 55 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F454857687582858479695748
Low °F242733415059626155433327
Precipitation, in3.83.94.54.44.44.34.73.83.32.83.24.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Abingdon sheet (1:125,000); the 1960 Abingdon sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • In a May 2025 scouting thread, commenters recommended Shuttle Shack in Damascus for rentals and shuttles, one using it every Memorial Day for years; another praised Adventure Damascus bikes and quick fitting in 2024. r/BSA, May 2025
  • In 2015 one rider described the surface as mostly crushed gravel that wears on road bikes within a couple of miles, while hybrid-width tires were fine; another found rental bikes worn and uncomfortable. r/EarthPorn, Mar 2015
  • One rider who tried the closed upper section in summer 2025 reported washed-out road within a mile, four or five creek crossings with bikes carried, and 2.5 hours for 3 miles before turning back. r/bicycletouring, Sep 2025
  • One rider familiar with the Trans-VA route said in September 2025 that Highway 58 from Whitetop Road into Damascus was about 13 miles, twisty and shoulderless, against roughly 23 on the official detour. r/bicycletouring, Sep 2025
20 Reddit threads about this trail, Mar 2015 to Mar 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1715009, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Virginia Creeper Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q16986556, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Virginia Creeper National Recreation Trail — George Washington and Jefferson National Forests, USDA Forest Service · government source · checked Oct 14, 2026
    Supports: open from Abingdon to Trestle 16 in Damascus, 17 miles to Whitetop closed; trail log (Abingdon trailhead with restrooms, parking and locomotive display, Dry Branch Trestle, South Holston Trestle at the forks of the Holston as lowest point, Alvarado, Damascus, Straight Branch, Taylor's Valley, Creek Junction, High Trestle 550 ft, Green Cove and Whitetop Station visitor centers, VA-NC line); 1,600-foot climb with grades near 7 percent; nickname from steep grades; last train March 31, 1977; non-motorized use
  5. Virginia Creeper Trail to fully reopen on March 31, 2027 — USDA Forest Service (July 16, 2026) · government source · checked Oct 14, 2026
    Supports: 34.3 miles between Abingdon, Damascus and Whitetop Station; Helene destroyed 17 miles in September 2024, 30 of 31 trestles damaged; $240 million Kiewit contract; construction began December 2025; reopening March 31, 2027; Damascus-to-Abingdon open; hiking, cycling and horseback riding
  6. History of the Trail — Virginia Creeper Trail Conservancy · organization · checked Oct 14, 2026
    Supports: Virginia-Carolina Railroad founded February 1900 for timber, N&W acquired the line by 1919 as the Abingdon Branch, last passenger train 1962, Forest Service purchases above Damascus, 1982 purchase of 13 miles by Abingdon and Damascus, National Recreation Trail June 1987, opened to Whitetop Station 1989, maintenance partnership

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.