States › Louisiana

Ward Creek Trail

Greenway in Louisiana

Runs through Baton Rouge · East Baton Rouge Parish

Conditions now

Loading the weather near Baton Rouge…

Forecast by the National Weather Service for Baton Rouge · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Bluebonnet Boulevard mile 0 directions to trailhead 1
  2. Parking at Bluebonnet Parc Avenue mile 0.3 directions to trailhead 2
  3. Parking at Bluebonnet Parc Avenue mile 0.4 directions to trailhead 3
  4. Parking at Mall of Louisiana Boulevard mile 0.6 directions to trailhead 4
  5. Parking at Mall of Louisiana Boulevard mile 0.6 directions to trailhead 5
  6. Parking at Mall of Louisiana Boulevard mile 0.7 directions to trailhead 6
Baton Rouge, Louisiana - panoramio (1) (opens in a new tab)
Baton Rouge, Louisiana - panoramio (1) · Photo: davidpinter · CC BY 3.0 · Wikimedia Commons

About this trail

The Ward Creek Trail is a concrete path of about 2 miles in Baton Rouge, East Baton Rouge Parish, Louisiana, running along Ward Creek near the Mall of Louisiana. A 2013 article in 225 Baton Rouge, which spells the name Wards Creek, described a trail from Bluebonnet Boulevard behind the mall, through The Grove development, to Siegen Lane, about 2.2 miles, then under construction by BREC.

The same article said BREC was seeking grants for a later phase to link the trail to Pennington Biomedical Research Center and the Rouzan development. OpenStreetMap maps the built sections as concrete cycleway designated for bicycles and pedestrians, with one section tagged as under construction. Current length and status are not confirmed by a BREC page, which refused automated access.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to April and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lsu Ben-Hur Farm, 9 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F616571788489919188807063
Low °F404450566571737268574742
Precipitation, in5.84.74.44.95.66.54.76.14.54.245.2
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Baton Rouge sheet (1:62,500); the 1953 Baton Rouge East sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Baton Rouge getting smarter: recent progress on parks and trails - 225 Baton Rouge · web · checked Oct 18, 2026
    Supports: route, 2.2 miles, BREC building in 2013, planned next phase
  3. OpenStreetMap · web · checked Oct 18, 2026
    Supports: concrete surface, designated bicycle, section tagged under construction

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.