States › Virginia

Warrenton Branch Greenway

Rail-trail in Virginia

Runs through Warrenton · Fauquier County

Conditions now

Loading the weather near Warrenton…

Forecast by the National Weather Service for Warrenton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
On former railbed
2.2 mi 95%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Old Meetze Road mile 0.9 directions to trailhead 1
  2. Parking at East Shirley Avenue mile 1.4 directions to trailhead 2
  3. Parking at East Shirley Avenue mile 1.5 directions to trailhead 3
  4. Parking at East Shirley Avenue mile 1.5 directions to trailhead 4
  5. Parking at South 3rd Street mile 2.2 directions to trailhead 5

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

Warrenton Historic District, beside the trail (opens in a new tab)
Warrenton Historic District, beside the trail · Photo: Strawser · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Warrenton Branch Greenway is a paved rail-trail in the Town of Warrenton, Virginia, built on part of the Warrenton Branch, a spur of the Orange and Alexandria Railroad completed in 1852. Passenger service on the branch ended in 1941 and all service was discontinued in 1988. Using a Virginia Department of Transportation grant, the Fauquier Trails Coalition, the Town of Warrenton and the Fauquier County Parks and Recreation Department developed the trail, and the county parks department is responsible for its overall maintenance, according to the trail's 2012 National Recreation Trail application.

The original trail ran 1.48 miles from the rail yard trailhead at the 4th Street parking lot in downtown Warrenton to the Old Meetze trailhead on the cul-de-sac at Old Meetze Road, with three road crossings and two bridges, mileage markers, kiosks and parking at each end. The 4th Street trailhead has a railroad-themed plaza and a caboose donated by the Norfolk and Western Railroad and restored by the Piedmont Railroaders club, which opens for guided tours seasonally; the volunteers also added a switch shanty, railroad signs and a working signal light. During trail construction the rail yard's turntable, which the railroad had abandoned and covered in 1951, was uncovered.

In 2013 the Piedmont Environmental Council reported that Fauquier County had obtained the right-of-way for an extension of about a mile after more than a decade of negotiations; the council raised $30,000 toward construction, alongside donations from the Fauquier Trails Coalition and a VDOT grant. The extension opened in the fall of 2021, bringing the greenway to 2.2 miles. It connects Old Town Warrenton with the Fauquier Education Farm and links to the Stafford Connector trail, which leads to Lord Fairfax Community College.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May, August and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Sperryville, 38.8 km from the trail's middle, 68 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434754657381858477675746
Low °F242631415059646256443528
Precipitation, in3.62.8444.75.23.74.15.43.73.74
Snow, in6.96.91.90.20000000.34.8
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Warrenton sheet (1:62,500); the 1966 Warrenton sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Warrenton, August 1862: Railroad depot, tracks and freight cars
Warrenton, August 1862: Railroad depot, tracks and freight carsPhoto: Timothy H. O'Sullivan · Public domain · Wikimedia Commons (opens in a new tab)

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Warrenton Branch Greenway — National Recreation Trails (2012 application record) · organization · checked Oct 14, 2026
    Supports: rail-trail; Warrenton Branch a spur of the Orange and Alexandria Railroad completed 1852; passenger service to 1941, all service discontinued 1988; VDOT grant, Fauquier Trails Coalition, Town of Warrenton and Fauquier County Parks and Recreation; county responsible for maintenance; 1.48 miles from 4th Street rail yard trailhead to Old Meetze Road cul-de-sac; paved; three road crossings, two bridges; mileage markers, kiosks, parking at each end; plaza, caboose donated by Norfolk and Western, restored by Piedmont Railroaders, seasonal tours, switch shanty, signage, signal light; turntable covered in 1951 and uncovered during construction
  3. Expanding the Warrenton Branch Greenway — The Piedmont Environmental Council (September 18, 2013) · organization · checked Oct 14, 2026
    Supports: county obtained right-of-way for about a mile after over a decade of negotiations; PEC to raise $30,000; Fauquier Trails Coalition donations and VDOT grant
  4. NEW Warrenton Branch Greenway Extension! — The Piedmont Environmental Council (December 17, 2021) · organization · checked Oct 14, 2026
    Supports: extension opened in fall 2021; length 2.2 miles; connects Old Town Warrenton to the Fauquier Education Farm; links with the Stafford Connector trail to Lord Fairfax Community College; PEC raised $30,000 after the county obtained the right-of-way

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.