States › Oregon

Warrenton Waterfront Trail

Rail-trail in Oregon

Runs through Warrenton · Clatsop County

Conditions now

Loading the weather near Warrenton…

Forecast by the National Weather Service for Warrenton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.0 mi 3.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Warrenton, along the trail (opens in a new tab)
Warrenton, along the trail · Photo: Gary Halvorson, Oregon State Archives · Attribution · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Warrenton Waterfront Trail is a paved path of about 2 miles in Warrenton, Oregon, on the Columbia River estuary near Astoria. OpenStreetMap maps it as an asphalt path on an abandoned railway, and Oregon Hikers describes the route as following an old railroad spur toward Point Adams, with much of the way on a railroad grade. Hammond, which Warrenton absorbed in 1991, was named for the lumberman who completed the Astoria and Columbia River Railroad.

A 2005 Daily Astorian article describes the waterfront section as running atop dikes along the Columbia River estuary and the Skipanon River, from the kayak dock at Second Street west to the Hammond Mooring Basin, and reports that the Warrenton Trails Association, formed in 2003, was working with the city to extend the network. Oregon Hikers places the route between the Warrenton Waterfront Trailhead, with parking off Main Avenue near 1st Street, and Seafarer's Park at the Hammond Boat Basin. It passes Alder Cove, Tansy Point, the former Point Adams Coast Guard Station and Carruthers Park, and notes restrooms at Carruthers Park and Seafarer's Park.

The Oregon Hikers description calls the trail a work in progress. Part of the route uses city streets, and some stretches are grass on the railroad grade. Fort Stevens State Park lies just west of Seafarer's Park.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Astoria Regional Airport, 4.3 km from the trail's middle, 1 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F495153566064676968615449
Low °F383739424651545450454038
Precipitation, in10.67.27.95.83.42.30.81.12.76.711.110.7
Old maps

USGS topographic maps of the trail's middle go back to the 1919 Astoria sheet (1:62,500); the 1953 Warrenton sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Warrenton Waterfront Hike — Oregon Hikers Field Guide · organization · checked Oct 17, 2026
    Supports: route, trailheads, railroad spur and grade, street and grass sections, work in progress, restrooms, Fort Stevens
  3. Warrenton, Oregon — Wikipedia · organization · checked Oct 17, 2026
    Supports: Hammond merged into Warrenton in 1991; Hammond named for lumberman who completed the Astoria and Columbia River Railroad
  4. After small steps, Warrenton trails project takes big leap — The Astorian · press · checked Oct 17, 2026
    Supports: dikes along estuary and Skipanon River, Second Street to Hammond Mooring Basin, Warrenton Trails Association formed 2003
  5. OpenStreetMap · web · checked Oct 17, 2026
    Supports: asphalt surface, abandoned railway tag

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.