States › Colorado

Wellman Canal Path

Canal towpath in Colorado

Runs through Boulder · Boulder County

Conditions now

Loading the weather near Boulder…

Forecast by the National Weather Service for Boulder · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.6 mi 1.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Monroe Drive mile 0.2 directions to trailhead 1
  2. Parking at Madison Avenue mile 0.6 directions to trailhead 2
  3. Parking at Madison Avenue mile 0.6 directions to trailhead 3
  4. Parking at Colorado Avenue mile 0.6 directions to trailhead 4
Wellman Canal Path (opens in a new tab)
Photo: dgrinbergs · CC BY-SA 4.0 · Mapillary

About this trail

The Wellman Canal Path is a short paved bicycle and pedestrian path in east Boulder, Colorado. The state's Colorado Trail Explorer (COTREX) lists it at 0.7 mile, with City of Boulder Transportation as its manager and an elevation range of 5,269 to 5,280 feet. OpenStreetMap maps it as a concrete path running east and west beside the Wellman Canal, an irrigation ditch, just south of Colorado Avenue, with a short bridge over the canal.

The path passes beneath Foothills Parkway in a bicycle and pedestrian underpass. The City of Boulder began building that underpass, on Foothills Parkway just south of Colorado Avenue, on September 23, 2019, to replace an existing pedestrian overpass, with about a year of work expected. Patch reported that the old bridge was at the end of its service life and did not meet current accessibility or bicycle facility guidelines, and that the $4.4 million project drew $3.2 million in federal and $1.2 million in city transportation funds. A note on the OpenStreetMap record says the underpass opened in mid-October 2020.

COTREX lists the path as open to bicycles, hiking and leashed dogs, and closed to horses and motor vehicles. OpenStreetMap shows it about 10 feet wide in places and maps other named concrete paths close by, including the Foothills Parkway Multi-Use Path and the Skunk Creek and Bear Creek greenways.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: June. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boulder, 2.6 km from the trail's middle, 63 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F474857637182888679665446
Low °F222229344351575648372821
Precipitation, in0.81233.21.91.81.72.11.61.20.8
Snow, in11.31515.714.720001713.113
Old maps

USGS topographic maps of the trail's middle go back to the 1904 Niwot sheet (1:62,500); the 1951 Niwot sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Wellman Canal Path | COTREX (Colorado Trail Explorer, Colorado Parks and Wildlife) · government source · checked Oct 17, 2026
    Supports: 0.7-mile length, paved surface, City of Boulder Transportation as manager, elevation range, allowed and prohibited uses
  3. Detours, lane closures on tap for 2 construction projects beginning near campus — CU Boulder Today · organization · checked Oct 17, 2026
    Supports: underpass on Foothills Parkway just south of Colorado Avenue, work starting September 23, 2019, replaces existing pedestrian overpass, about a year of work
  4. Construction Begins On Boulder's Foothills Parkway Underpass — Patch · press · checked Oct 17, 2026
    Supports: old bridge at end of service life and not meeting ADA or bike facility guidelines; $4.4 million cost with $3.2 million federal and $1.2 million city funds
  5. Wellman Canal Path underpass (way 43418169) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: path runs through the Foothills Parkway underpass; note that the underpass opened mid-October 2020
  6. Wellman Canal Path (way 194538000) — OpenStreetMap · web · checked Oct 17, 2026
    Supports: concrete surface, 10-foot width, designated for bicycles and pedestrians; nearby Wellman Canal ditch, canal bridge (way 104314769), and nearby Foothills Parkway Multi-Use Path, Skunk Creek Greenway and Bear Creek Greenway

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.