West Bank Path
Greenway in Oregon
Runs through Eugene · Lane County
Conditions now
Loading the weather near Eugene…
Forecast by the National Weather Service for Eugene · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at River Road mile 1.7 directions to trailhead 1
Plan your visit
- By trainAmtrak: Eugene, OR (EUG) 1.3 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The West Bank Path is a paved path of about 1.7 miles along the west bank of the Willamette River in Eugene, Oregon. It is one of four paths of the Ruth Bascom Riverbank Path System, named for Ruth Bascom, Eugene's mayor from 1993 to 1996, who set up paths for cyclists and pedestrians. Wikipedia gives the whole system as about twelve miles along the river.
Oregon Hikers describes the West Bank Path as beginning where the river bends north, near the Greenway Bike Bridge, which leads to the Valley River Center area on the north bank. The path runs through Rasor Park to Stephens Drive, where the route follows the road for less than a block, then continues past a filbert orchard and open cottonwood riverbank and crosses the mouth of Heron Slough on a footbridge. At Copping Street by Maynard Park the route follows the street for about six blocks before the path resumes and turns onto the Owosso Bridge, where it meets the East Bank Path.
The Oregon Hikers guide calls the four Riverbank paths paved trails and a bike and walking route. Its linked park resources are from Eugene Parks; the guide does not name a manager for the path itself.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
31% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Eugene Mahlon Sweet Airport, 10 km from the trail's middle, 14 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 52 57 61 68 74 84 84 78 65 53 47 Low °F 35 35 37 40 44 48 52 52 48 42 38 34 Precipitation, in 6 4.7 4.6 3.3 2.5 1.2 0.3 0.4 1.4 3.2 6 7.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1910 Eugene sheet (1:62,500); the 1967 Eugene East sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- South Bank Path within 0.2 mi · 2.5 mi, paved
- East Bank Path within 0.2 mi · 2.9 mi, paved
- North Bank Path within 0.2 mi · 4.6 mi, paved
- Roosevelt Path 1.1 mi away · 1.8 mi, paved
- Fern Ridge Path 1.6 mi away · 6.9 mi, paved
- Amazon Path 2.3 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Eugene Riverbank Loop Hike — Oregon Hikers Field Guide · organization · checked Oct 17, 2026 Supports: route, Rasor and Maynard parks, Heron Slough footbridge, Greenway Bike Bridge, Owosso Bridge, paved, street sections
- Ruth Bascom — Wikipedia · organization · checked Oct 17, 2026 Supports: system named for Bascom, mayor 1993-1996, path advocacy, system about twelve miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.