West Cambridge Trail
Rail-trail in South Carolina
Runs through Greenwood · Greenwood County
Conditions now
Loading the weather near Greenwood…
Forecast by the National Weather Service for Greenwood · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Hunter Street mile 0.2 · restrooms directions to trailhead 1
- Parking at Grove Street mile 0.2 · restrooms directions to trailhead 2
- Parking at Calhoun Avenue mile 0.4 directions to trailhead 3
- Parking at Crescent Road mile 0.5 directions to trailhead 4
- Parking at McGhee Avenue mile 0.6 directions to trailhead 5
- Parking at McGhee Avenue mile 0.7 directions to trailhead 6
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The West Cambridge Trail is a rail-trail of about 1.4 miles in Greenwood, South Carolina. It begins at West Cambridge Park, an 11-acre park at Grove Street and West Cambridge Avenue on the site of an old railroad switching yard. Greenwood County's Rails to Trails project began after a network of railroad tracks in the county was relocated, and the trail follows a former rail line out of the yard. The Greenwood Parks and Trails Foundation says the trail was developed in 2000 through the work of hundreds of volunteers, from scouts to senior citizens.
From West Cambridge Park the trail runs northwest toward the SC 72 bypass. The trail lies below grade and passes under roadways. West Cambridge Park serves as the trailhead, with a playground, a gazebo, parking and restrooms at 451 Grove Street. The one-mile Cambridge Gateway Trail, opened on March 29, 2014, also starts at West Cambridge Park and runs west along West Cambridge Avenue to the bypass; the foundation describes it as linking to the West Cambridge Trail and on to the walking and jogging track at Lander University's sports complex.
The trail is about eight feet wide with a packed stone-dust surface that is patchy in places; some mapped stretches are listed as earth. It is open to walkers and cyclists, and the full out-and-back is about three miles, the figure the foundation uses for the trail.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Greenwood County Airport, 5.6 km from the trail's middle, 1 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 65 73 80 87 90 89 83 74 63 56 Low °F 32 35 41 48 57 65 68 68 62 49 39 34 Precipitation, in 3.9 3.6 4.2 2.8 3 3.7 3.8 3.2 3.4 3 3.3 4 - Old maps
USGS topographic maps of the trail's middle go back to the 1892 Abbeville sheet (1:125,000); the 1949 Greenwood sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationGreenwood Parks and Trails Foundation
Nearby trails
- Railroad and Mill Village Heritage Trail 0.7 mi away · 2.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Parks and Trails — Greenwood Parks and Trails Foundation · organization · checked Oct 16, 2026 Supports: West Cambridge Trail developed in 2000 by hundreds of volunteers from scouts to senior citizens; three-mile figure
- Cambridge Gateway Trail — Greenwood Parks and Trails Foundation · organization · checked Oct 16, 2026 Supports: 1.4-mile West Cambridge Trail; Greenwood County Rails to Trails launched after railroad tracks were relocated; Cambridge Gateway Trail one mile from West Cambridge Park to the 72 bypass, opened March 29, 2014; link on to Lander University sports complex track
- Twelve Trails for Exploring Greenwood — Discover Greenwood · web · checked Oct 16, 2026 Supports: West Cambridge Park is 11 acres at Grove Street and West Cambridge Avenue on an abandoned rail switching yard; eight feet wide; biking and walking
- West Cambridge Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 16, 2026 Supports: endpoints West Cambridge Park and Bypass 72 NW; packed stone dust, patchy in places; below grade, passing under roadways; pedestrians and cyclists; three miles out-and-back; parking and restrooms at 451 Grove Street; playground and gazebo
- West Cambridge Trail — OpenStreetMap way 894017877 · web · checked Oct 16, 2026 Supports: earth surface on part of the mapped line; abandoned railway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.