Westfield River Levee Trail
Greenway in Massachusetts
Runs through Westfield · Hampden County
Conditions now
Loading the weather near Westfield…
Forecast by the National Weather Service for Westfield · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Meadow Street mile 0.7 directions to trailhead 1
- Parking at Meadow Street mile 0.7 directions to trailhead 2
- Parking at Meadow Street mile 0.8 directions to trailhead 3
- Parking at Fowler Street mile 1.2 directions to trailhead 4
- Parking at Main Street mile 1.7 directions to trailhead 5
About this trail
The Westfield River Levee Trail is a path on top of the flood-control levee along the Westfield River in Westfield, Massachusetts. The map record measures about 1.7 miles. An existing walking trail already ran along the levee in 2019, which the city described as certified and groomed twice a year, and the Columbia Greenway Rail Trail meets it downtown.
In 2014 the city presented a 950-foot, 10-foot-wide paved path on the levee between Sackett and Elm Streets, with two overlooks and lighting. In 2015 the Board of Public Works approved a $1.2 million contract for an esplanade between those streets where the rail trail meets the Levee Walk Trail. In 2019 the city submitted 25 percent plans for a multi-use trail extending the esplanade about a mile west to Ellsworth Street and about a mile east to Riding Williams Way, with a 16-foot levee crest and a 10-foot trail.
A television report describes a groundbreaking for the Westfield River Levee Multi-Use Path, about 1.53 miles long, linking neighborhoods to downtown, the future Columbia Greenway Rail Trail, Chapman Playground and Whitney Field. The report gives no date and does not state the surface, so how much of the route is open is not confirmed.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Westfield Barnes Municipal Airport, 4 km from the trail's middle, 39 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 47 60 72 80 85 83 75 63 51 40 Low °F 16 17 26 35 46 55 61 59 51 39 30 22 Precipitation, in 2.8 2.6 3.4 4.1 3.7 4.4 4.2 3.7 4.6 4.7 3.5 3.6 - On the National Register
- Westfield Center Historic District, Westfield · historic district, listed 2013
- Westfield Center Commercial Historic District, Westfield · historic district, listed 2008 · nomination file for Westfield Center Commercial Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1886 Springfield sheet (1:62,500); the 1958 Mount Tom sheet (1:24,000) shows the area at mid-century. Browse all 23 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
Nearby trails
- Columbia Greenway Rail Trail within 0.2 mi · 3.0 mi, paved
- Court St/Western Ave Shared Use Path 0.6 mi away · 2.7 mi, paved
- New Haven & Northampton Canal Greenway 2.3 mi away · 6.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City submits 25% design for the Westfield River Levee Multi-Use Trail - The Westfield News (July 19, 2019) · press · checked Oct 17, 2026 Supports: 25 percent design, extension to Ellsworth Street and Riding Williams Way, widths, connections, existing walking trail
- Board approved multi-use trail contract - The Westfield News (July 16, 2015) · press · checked Oct 17, 2026 Supports: $1.2 million esplanade contract between Elm and Sackett Streets
- Multi-use rec trail project discussed - The Westfield News (November 26, 2014) · press · checked Oct 17, 2026 Supports: 950 linear feet, 10-foot path, overlooks, lighting
- Construction begins for Westfield River levee to connect downtown path - WWLP · web · checked Oct 17, 2026 Supports: 1.53 miles, groundbreaking, connections
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.