States › Massachusetts

Westfield River Levee Trail

Greenway in Massachusetts

Runs through Westfield · Hampden County

Conditions now

Loading the weather near Westfield…

Forecast by the National Weather Service for Westfield · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.7 mi 2.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Meadow Street mile 0.7 directions to trailhead 1
  2. Parking at Meadow Street mile 0.7 directions to trailhead 2
  3. Parking at Meadow Street mile 0.8 directions to trailhead 3
  4. Parking at Fowler Street mile 1.2 directions to trailhead 4
  5. Parking at Main Street mile 1.7 directions to trailhead 5
Westfield River Levee Trail drawn on the 1943 USGS topographic map of Holyoke, Massachusetts
Then: the 1943 USGS Holyoke sheet (1:125,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

About this trail

The Westfield River Levee Trail is a path on top of the flood-control levee along the Westfield River in Westfield, Massachusetts. The map record measures about 1.7 miles. An existing walking trail already ran along the levee in 2019, which the city described as certified and groomed twice a year, and the Columbia Greenway Rail Trail meets it downtown.

In 2014 the city presented a 950-foot, 10-foot-wide paved path on the levee between Sackett and Elm Streets, with two overlooks and lighting. In 2015 the Board of Public Works approved a $1.2 million contract for an esplanade between those streets where the rail trail meets the Levee Walk Trail. In 2019 the city submitted 25 percent plans for a multi-use trail extending the esplanade about a mile west to Ellsworth Street and about a mile east to Riding Williams Way, with a 16-foot levee crest and a 10-foot trail.

A television report describes a groundbreaking for the Westfield River Levee Multi-Use Path, about 1.53 miles long, linking neighborhoods to downtown, the future Columbia Greenway Rail Trail, Chapman Playground and Whitney Field. The report gives no date and does not state the surface, so how much of the route is open is not confirmed.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Westfield Barnes Municipal Airport, 4 km from the trail's middle, 39 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353847607280858375635140
Low °F161726354655615951393022
Precipitation, in2.82.63.44.13.74.44.23.74.64.73.53.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1886 Springfield sheet (1:62,500); the 1958 Mount Tom sheet (1:24,000) shows the area at mid-century. Browse all 23 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Westfield River Levee Trail (opens in a new tab)
360° panorama · Photo: medic1000 · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City submits 25% design for the Westfield River Levee Multi-Use Trail - The Westfield News (July 19, 2019) · press · checked Oct 17, 2026
    Supports: 25 percent design, extension to Ellsworth Street and Riding Williams Way, widths, connections, existing walking trail
  3. Board approved multi-use trail contract - The Westfield News (July 16, 2015) · press · checked Oct 17, 2026
    Supports: $1.2 million esplanade contract between Elm and Sackett Streets
  4. Multi-use rec trail project discussed - The Westfield News (November 26, 2014) · press · checked Oct 17, 2026
    Supports: 950 linear feet, 10-foot path, overlooks, lighting
  5. Construction begins for Westfield River levee to connect downtown path - WWLP · web · checked Oct 17, 2026
    Supports: 1.53 miles, groundbreaking, connections

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.