States › North Carolina

Westinghouse Blvd Shared Use Path

Greenway in North Carolina

Runs through Charlotte · Mecklenburg County

Conditions now

Loading the weather near Charlotte…

Forecast by the National Weather Service for Charlotte · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Westinghouse Boulevard mile 1.3 directions to trailhead 1
  2. Parking at Westinghouse Boulevard mile 1.4 directions to trailhead 2
  3. Parking at Westinghouse Boulevard mile 1.5 directions to trailhead 3
  4. Parking at Westinghouse Boulevard mile 1.8 directions to trailhead 4
  5. Parking at Westinghouse Boulevard mile 1.9 directions to trailhead 5
Westinghouse Blvd Shared Use Path drawn on the 1949 USGS topographic map of Charlotte West, North Carolina
Then: the 1949 USGS Charlotte West sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Westinghouse Blvd Shared Use Path is a concrete side path along Westinghouse Boulevard in southwest Charlotte, North Carolina. It is not a rail-trail. The name used here comes from OpenStreetMap, which maps about 1.3 miles of path in several pieces over a stretch of about 2 miles, beginning at Steele Creek Road (NC 160) at its western end and running east beside the boulevard. The mapped path is designated for both bicycles and pedestrians and is not split into separate lanes for each.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Charlotte Douglas Airport, 10.2 km from the trail's middle, 38 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525764738087908983736355
Low °F323541495866706963504034
Precipitation, in3.53.143.83.443.74.33.73.23.33.6
Snow, in1.61.10.300000000.10.4
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Charlotte sheet (1:48,000); the 1949 Charlotte West sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Westinghouse Blvd Shared Use Path — OpenStreetMap way 1221469157 (one of the record's ways) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: name; concrete; bicycle and foot designated; not segregated; mapped pieces of about 1.3 miles from Steele Creek Road (NC 160) eastward along Westinghouse Boulevard

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.