Westside Trail
Greenway in Oregon · OpenStreetMap relation
Runs through Bethany and Beaverton · Washington County
Conditions now
Loading the weather near Beaverton…
Forecast by the National Weather Service for Beaverton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by Tualatin Hills Park & Recreation District.2
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Southwest Audubon Street mile 5.3 directions to trailhead 1
- Parking at Southwest Lancaster Way mile 5.4 directions to trailhead 2
- Parking at Southwest Blanton Street mile 5.4 directions to trailhead 3
- Parking at Southwest Blanton Street mile 5.4 directions to trailhead 4
- Parking at Southwest Marlee Lane mile 5.8 directions to trailhead 5
- Parking at Southwest Horizon Boulevard mile 9.9 directions to trailhead 6
- Parking at Southwest Scholls Ferry Road mile 10 directions to trailhead 7
- Parking at Southwest Sandhill Loop mile 10.1 directions to trailhead 8
- Parking at Southwest 147th Terrace mile 10.1 directions to trailhead 9
- Parking at Southwest Magpie Lane mile 10.2 directions to trailhead 10
- Parking at Southwest Magpie Lane mile 10.2 directions to trailhead 11
- Parking at Southwest Magpie Lane mile 10.2 directions to trailhead 12
- Parking mile 10.2 directions to trailhead 13
- Parking mile 10.3 directions to trailhead 14
- Parking at Southwest Barrows Road mile 10.4 directions to trailhead 15
About this trail
The Westside Trail is a paved multi-use path of about 5.9 miles in Oregon, mapped in OpenStreetMap as a bicycle route and operated by the Tualatin Hills Park & Recreation District (THPRD). In OpenStreetMap the route is tagged with a longer distance of 12 miles, so the figure for the stretch mapped here and the regional route are not the same.
The trail is built in segments. A 2009 report on the opening of a 2-mile link, announced by the park district, places it running south from the Tualatin Hills Nature Park, at 15655 SW Millikan Way in Beaverton, toward the base of Mt. Williams near Oak Street. The district described the segments as part of a planned 10-mile north-south backbone from the Portland Community College Rock Creek Campus to Barrows Road, funded in part by the district's 2008 bond measure.
The park district's own trail page could not be fetched for this article, so current surface conditions, trailheads and closures are not confirmed here.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Nature Park-Beaverton, 0.4 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 50 54 58 63 70 73 81 82 76 65 55 49 Low °F 40 40 42 45 50 53 56 57 52 47 43 40 Precipitation, in 5.5 4.3 4.1 3 2.2 1.7 0.5 0.5 1.4 3.9 5.9 6.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1916 Tualatin sheet (1:62,500); the 1954 Beaverton sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in November 2024 and February 2026 described a paved route; one said it runs from Highway 26 toward Tigard with some hilly sections, another said parking in nearby residential streets was easy. r/beaverton, Nov 2024 · r/beaverton, Feb 2026
- Two riders in February 2026 pointed to stretches: Cornell Road to Progress Ridge near 158th as the most built out, and the section from SW 160th and Hart continuing to Scholls Ferry. r/beaverton, Feb 2026
- Riders in December 2025 discussed a planned Sexton Mountain Drive connector, still a muddy footpath; one noted the district's page listed the project as paused, and another thought nearby clearing was utility work. r/beaverton, Dec 2025
3 Reddit threads about this trail, Nov 2024 to Feb 2026
- Neighborhoods for a nice long walk? r/beaverton · Feb 2026 · 36 comments
- Sexton Mountain Dr/Westside trail connector r/beaverton · Dec 2025 · 4 comments
- Walking/Running Tracks r/beaverton · Nov 2024 · 23 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/oregon
Nearby trails
- Waterhouse Trail within 0.2 mi · 5.1 mi, paved
- Rock Creek Trail within 0.2 mi · 7.4 mi, paved
- Yoshihara Trail within 0.2 mi · 1.9 mi, paved
- River Terrace Trail 1.0 mi away · 1.9 mi, paved
- South Cooper Mountain Trail 1.3 mi away · 1.3 mi, paved
- Tualatin River Greenway Trail 1.5 mi away · 5.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 358177, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Tualatin Hills Park & Recreation District · Official site · checked Oct 31, 2026
- New link in Westside Trail opens this week - BikePortland · organization · checked Oct 17, 2026 Supports: 2009 opening of a 2-mile segment from Tualatin Hills Nature Park toward Mt. Williams near Oak St.; planned 10-mile backbone from PCC Rock Creek Campus to Barrows Road; 2008 bond measure; THPRD
- OpenStreetMap relation 358177 - Westside Trail · web · checked Oct 17, 2026 Supports: name, operator THPRD, bicycle route tag, 12 mi distance tag
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.