Whitehorse Regional Trail
Rail-trail in Washington · OpenStreetMap relation
Runs through Oso, Swede Heaven and Darrington · Snohomish County
Partly closed: Several sections are closed: the French Creek bridge, the first three miles (future Phase 3 resurfacing and landslide repair), a spot 1.7 miles east of the Trafton trailhead, and a section west of Darrington. In Phase 3, the section between the Centennial Trail and Bridge 701 is fully closed from October 5, 2026 to spring 2027. Notice dated Nov 17, 2026 on snohomishcountywa.gov, checked Nov 25.
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Miller Shingle mile 10 directions to Miller Shingle
- Miller Shingle Trailhead mile 10 directions to Miller Shingle Trailhead
- Parking at Steelhead Drive mile 15.3 · restrooms directions to trailhead 3
- Parking at Fortson Mill Road mile 20.6 directions to trailhead 4
- Whitehorse Trail mile 27 directions to Whitehorse Trail
(opens in a new tab) About this trail
The Whitehorse Regional Trail is a rail-trail of more than 27 miles between the City of Arlington and the Town of Darrington in Snohomish County, Washington. Snohomish County Parks & Recreation manages it. The trail follows the former BNSF railroad through the North Stillaguamish River Valley, often alongside State Route 530 and the North Fork Stillaguamish River, and is open to hiking, biking and horseback riding, with no motorized vehicles. The 2014 Oso mudslide, which killed 43 people, wiped out a stretch of the trail; the county rebuilt that segment with FEMA money, and the Everett Herald reported in November 2016 that it was expected to open the following March.
The trail begins at a junction with the Centennial Regional Trail in Arlington; the two trails together form 62 continuous miles. County trailheads include Trafton on 115th Avenue NE, Miller Shingle and C-Post Road on SR 530, Hazel Hole, Fortson Mill on Fortson Mill Road, and the Price Street trailhead in Darrington, which has parking for about six to eight cars. Hours are 7 a.m. to dusk.
Much of the trail has been resurfaced with compacted gravel. As of October 2026 the county lists four closures: the first three miles, between the Centennial Trail and Bridge 701, closed for Phase 3 construction from October 5, 2026 to spring 2027; 1.7 miles east of the Trafton trailhead, from river bank erosion; the French Creek bridge, about 1.5 miles west of the Fortson Mill trailhead, closed to all users with no detour; and a section west of Darrington near 435th Avenue NE, where a reroute around a bank failure is on hold. Phase 3, estimated at $3.1 million, stabilizes the landslide at the west end and resurfaces the first three miles to connect the trail to the Centennial Trail.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former BNSF Railway line. From Rail Lines of Washington State (WSDOT).
- Shade
49% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Concrete Ppl Fish Stn, 31.6 km from the trail's middle, 13 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 43 47 52 58 65 69 76 77 71 59 49 42 Low °F 33 34 36 40 45 50 53 54 50 44 38 34 Precipitation, in 10.4 6.7 7.6 5.1 3.5 2.7 1.2 1.5 3.3 7.3 11.5 10.4 Snow, in 5 1.5 1.3 0 0 0 0 0 0 0 0.9 7.6 - On the National Register
- Darrington Ranger Station, Darrington · historic district, listed 1991 · nomination file for Darrington Ranger Station
- Old maps
USGS topographic maps of the trail's middle go back to the 1899 Stillaguamish sheet (1:125,000); the 1956 Oso sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Snohomish County Centennial Trail within 0.2 mi · 30.6 mi, paved
- Smokey Point Airport Trail 2.6 mi away · 2.8 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 16152541, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Whitehorse Regional Trail — Snohomish County, WA (Parks and Facilities) · government source · checked Oct 17, 2026 Supports: length over 27 miles, Arlington to Darrington, former BNSF railroad, North Stillaguamish valley, SR 530 and North Fork Stillaguamish, junction with Centennial Trail, hiking/biking/equestrian use and no motorized vehicles, compacted gravel resurfacing, trailheads and their locations, Price Street parking 6-8 cars, hours 7 a.m. to dusk, four current closures
- Whitehorse Regional Trail (Phase 3 Improvements) — Snohomish County, WA · government source · checked Oct 17, 2026 Supports: Phase 3 closure between Centennial Trail and Bridge 701 from October 5, 2026 to spring 2027, French Creek bridge closed with no detour about 1.5 miles west of Fortson Mill, reroute near 435th Ave on hold, Phase 3 scope (landslide stabilization, resurfacing first three miles, connection to Centennial Trail), $3.1 million estimated cost, Snohomish County Parks & Recreation as manager
- Park News and Alerts — Snohomish County, WA · government source · checked Oct 17, 2026 Supports: October 5, 2026 to spring 2027 full closure between Centennial Trail and Bridge 701, four closed sections along the trail
- Whitehorse Trail at Oso mudslide rebuilt, to open next year — The Everett Herald (2016) · press · checked Oct 17, 2026 Supports: 2014 Oso mudslide wiped out a trail segment and killed 43 people, rebuild with FEMA money, expected opening the following March, Centennial and Whitehorse together form 62 continuous miles, old railroad grade
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
