States › Washington

Willapa Hills Trail

Rail-trail in Washington · OpenStreetMap relation

Runs through South Bend, Raymond, Lebam and Pe Ell · Pacific and Lewis counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Willapa Hills Trail is a 56.0-mile (90.1 km) intercounty rail trail in the U.S. state of Washington that is part of the Willapa Hills State Park. Following an east–west route alongside State Route 6, the tract links Chehalis and South Bend, traveling through or near several small towns and parks along the way. Overseen by the Washington State Parks and Recreation Commission, local cities and towns often maintain areas of the trail within their jurisdictions. The trail is built upon a decommissioned railroad track.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Managed by Washington State Parks.4

Length
56.7 mi 91.3 km1
On former railbed
51.5 mi 91%
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Summit Avenue mile 0.2 · restrooms directions to trailhead 1
  2. Parking at Willapa Place Way mile 2.9 directions to trailhead 2
  3. Parking at Willapa Place Way mile 3 directions to trailhead 3
  4. Parking at Willapa Place Way mile 3 directions to trailhead 4
  5. Parking at Ocean Avenue mile 3.1 directions to trailhead 5
  6. Parking at Ocean Avenue mile 3.2 directions to trailhead 6
  7. Parking at Ocean Avenue mile 3.2 directions to trailhead 7
  8. Parking at Alder Street mile 3.2 · restrooms directions to trailhead 8
  9. Parking at Alder Street mile 3.5 · restrooms directions to trailhead 9
  10. Parking at Lebam Road mile 18.1 directions to trailhead 10
  11. Parking at 2nd Street mile 18.5 directions to trailhead 11
  12. Parking at East 4th Avenue mile 34.1 · restrooms · water directions to trailhead 12
  13. Parking at Front Street mile 34.2 · restrooms · water directions to trailhead 13
  14. Willapa Hills Trail Meskill Road Parking Area mile 43.6 directions to Willapa Hills Trail Meskill Road Parking Area
  15. Willapa Hills Trail Ceres Hill Parking Area mile 46.4 directions to Willapa Hills Trail Ceres Hill Parking Area
  16. Willapa Hills Trail - Adna Trailhead mile 51.7 · restrooms directions to Willapa Hills Trail - Adna Trailhead
  17. Parking mile 51.9 · restrooms directions to trailhead 17
  18. Parking mile 52.3 directions to trailhead 18
  19. Willapa Hills Trail Chehalis Trailhead Additional Parking mile 56.1 directions to Willapa Hills Trail Chehalis Trailhead Additional Parking
Willapa Hills Trail, Chehalis Trailhead (opens in a new tab)
Willapa Hills Trail, Chehalis Trailhead · Photo: Shortiefourten · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Willapa Hills Trail is a 56-mile rail-trail in southwest Washington that runs east-west between Chehalis in Lewis County and South Bend in Pacific County, mostly alongside State Route 6. It forms Willapa Hills State Park and is managed by Washington State Parks, with some towns maintaining the stretches inside their limits. The corridor is a Northern Pacific branch built in 1892 that carried passengers until March 19, 1954; Burlington Northern abandoned it in 1990, and the state parks commission acquired the 757-acre strip in 1993. The first finished section, 7 miles between Rainbow Falls State Park and Pe Ell, opened in 2001.

Trailheads in Lewis County are at Chehalis, Adna, Rainbow Falls State Park and Pe Ell, and in Pacific County at Lebam, Menlo, Raymond and South Bend. The route crosses the Chehalis River five times in Lewis County and the Willapa River twice in Pacific County, and passes Willie Keil's Grave State Park Heritage Site north of Menlo. Bridges and trestles near Adna and Dryad damaged in the 2007 floods were rebuilt by 2016, and the Littell Bridge carrying the trail over State Route 6 west of Claquato opened in June 2023.

The surface changes along the way: asphalt from Chehalis through Adna to about mile 5, compacted gravel to mile 27 west of Pe Ell, natural or unimproved railbed through most of Pacific County to the Raymond city limits near mile 52, and asphalt again for the five miles from Raymond to South Bend, which ends at a small trailhead off Highway 101. State Parks warns that many Pacific County miles are rough or impassable on railroad ballast. As of October 2026, State Parks listed the trail as closed at milepost 38.5 west of Lebam because of a washout, with a bridge in design, and between mileposts 48 and 49 at Trestle 48 east of Heckard Road because of erosion.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Former BNSF Railway line. From Rail Lines of Washington State (WSDOT).

Shade

37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Grays Rvr Hatchery, 21.3 km from the trail's middle, 190 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505456616770777774645549
Low °F343335384346505046403634
Precipitation, in16.710.111.68.14.43.41.21.94.410.215.216.3
Snow, in1.50.30.1000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1941 Walville sheet (1:62,500); the 1953 Pe Ell sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

15 Reddit threads about this trail, May 2024 to Apr 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 1874791, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Willapa Hills Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q110128060, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Washington State Parks · Official site · checked Oct 31, 2026
  5. Willapa Hills State Park Trail | Washington State Parks · government source · checked Oct 17, 2026
    Supports: 56 miles Chehalis (Lewis County) to South Bend (Pacific County), permitted users, year-round use, trailheads by county, most start at Chehalis heading west, surface by milepost, ballast and impassable sections, closures at MP 38.5 west of Lebam (washout, bridge in design) and MP 48-49 at Trestle 48 east of Heckard Rd, end at a small trailhead off Highway 101
  6. Willapa Hills Trail - Wikipedia · organization · checked Oct 17, 2026
    Supports: part of Willapa Hills State Park, parallels SR 6, towns maintain local stretches, Northern Pacific 1892, last passenger train March 19, 1954, abandoned by Burlington Northern 1990, 757 acres acquired 1993, Rainbow Falls-Pe Ell section opened 2001, five Chehalis River and two Willapa River crossings, Willie Keil's Grave, 2007 flood repairs completed 2016, Littell Bridge opened June 2023

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.