States › Missouri

Wilson's Creek Blvd Trail

Greenway in Missouri

Runs through Republic · Greene County

Conditions now

Loading the weather near Republic…

Forecast by the National Weather Service for Republic · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Republic, along the trail (opens in a new tab)
Republic, along the trail · Photo: Michaelalandis · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Wilson's Creek Blvd Trail is a paved path of about 1.5 miles in this record, mapped near Republic, Missouri. A 2021 Ozarks Transportation Organization funding request described a trail of this name, connecting Republic High School and Wilson's Creek National Battlefield, built beside State Highway ZZ within the existing state right-of-way, with a total cost of $2.5 million. It would link to the city's Shuyler Creek Trail. Ozark Greenways says the Shuyler Creek Greenway is a 0.75-mile paved path managed by the City of Republic, and that in April 2020 the city received $394,214 for design and right-of-way work on an extension of nearly 2 miles toward the battlefield.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

0% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Springfield, 12 km from the trail's middle, 21 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F445059687685908981705747
Low °F242836465665696759473628
Precipitation, in2.52.43.54.75.64.53.93.64.33.63.62.6
Snow, in4.43.320.10000000.63.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1884 Springfield sheet (1:125,000); the 1960 Brookline sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Regional Trails: Wilson's Creek Boulevard Trail — Ozarks Transportation Organization · organization · checked Oct 18, 2026
    Supports: trail name, route beside Highway ZZ in MoDOT right-of-way, Republic High School to the battlefield, $2.5 million cost, link to Shuyler Creek Trail
  3. Shuyler Creek Greenway — Ozark Greenways · organization · checked Oct 18, 2026
    Supports: 0.75 miles, paved, City of Republic; April 2020 $394,214 for an extension of nearly 2 miles toward the battlefield

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.