Windham Rail Trail
Rail-trail in New Hampshire · OpenStreetMap relation
Runs through Windham · Rockingham County
Conditions now
Loading the weather near Derry…
Forecast by the National Weather Service for Derry · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Depot Road mile 0.2 directions to trailhead 1
- Parking at Rockingham Road mile 4.1 directions to trailhead 2
(opens in a new tab) About this trail
The Windham Rail Trail is a paved rail trail of about 4.2 miles across Windham, New Hampshire, on the former Manchester and Lawrence Railroad. That railroad was chartered in 1847 and opened in November 1849 from Manchester to the Massachusetts line, where it met the Boston and Maine's Methuen Branch to Lawrence; the Boston and Maine took control of it in 1887. The section between North Salem and Derry was taken out of service on November 6, 1980, and Guilford abandoned it in 1984. The trail is cared for by the Windham Rail Trail Alliance, a nonprofit formed by Windham residents and funded by grants, private donations and volunteers, which works with the state Bureau of Trails on the Manchester and Lawrence corridor.
The trail was completed from the Derry town line south to Roulston Road in 2006 and to the Salem town line in 2016. To the north it continues as the Derry Rail Trail, and the two together form about 8 miles of paved rail trail; to the south the Salem Bike/Ped Corridor continues on the same railbed, with northern portions opened in 2016 and 2018. The alliance describes the trail as the anchor segment of the Granite State Rail Trail.
The main trailhead is Windham Depot at 6 Depot Road, part of a historic district, where a former Boston and Maine caboose, C-16, stands; parking there is prohibited from 30 minutes after sunset to 30 minutes before sunrise. ATVs are not allowed in any season, and snowmobiles may use the trail only when the Bureau of Trails opens the county's trails.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Manchester and Lawrence Branch, Worcester - Nashua - Rochester and State of New Hampshire - Inactive. From New Hampshire Railroads (NH GRANIT / NHDOT).
- Shade
74% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
W Hampstead, 10.6 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 37 45 57 68 76 82 80 73 61 49 38 Low °F 15 16 24 34 44 54 60 58 51 39 30 21 Precipitation, in 3 3.3 4.2 4.1 4 4 3.6 3.7 4 4.9 3.7 4.2 Snow, in 17.5 21.9 14.3 2.7 0 0 0 0 0 0.9 2.1 16.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1905 Manchester sheet (1:62,500); the 1953 Windham sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationWindham Rail Trail Alliance
- Agency noticesManchester/Lawrence Recreational Rail Trail (NH State Parks)
- FacebookWindham Rail Trail Alliance (Facebook)
Nearby trails
- Salem Bike-Ped Corridor within 0.2 mi · 4.8 mi, paved
- Derry Rail Trail within 0.2 mi · 3.4 mi, paved
- Rockingham Recreational Trail Fremont Branch within 0.2 mi · 18.2 mi, crushed stone
- Windham Greenway 0.2 mi away · 2.7 mi, dirt
- Londonderry Rail Trail 4.4 mi away · 4.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13380178, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Manchester/Lawrence Recreational Rail Trail — NH State Parks · government source · checked Oct 13, 2026 Supports: Windham Rail Trail Alliance among the partners working with the Bureau of Trails, Windham Depot parking
- Manchester and Lawrence Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: 1847 charter, November 1849 opening, Methuen Branch, B&M control in 1887, North Salem–Derry section out of service November 6, 1980 and abandoned 1984, trail completed to Roulston Road in 2006 and to the Salem line in 2016, Salem Bike/Ped trail portions opened 2016 and 2018
- Windham Rail Trail Alliance · organization · checked Oct 13, 2026 Supports: nonprofit formed by Windham citizens, funding by grants, donations and volunteers, about 8 paved miles with the Derry Rail Trail, Granite State Rail Trail anchor segment, Windham Depot at 6 Depot Road in a historic district, caboose C-16, parking hours, no ATVs, snowmobile rules
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.