Withlacoochee Bay Trail
Greenway in Florida · OpenStreetMap relation
In Citrus County
Conditions now
Loading the weather near Inglis…
Forecast by the National Weather Service for Inglis · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 1.2 · restrooms directions to trailhead 1
- Parking mile 1.2 · restrooms directions to trailhead 2
- Parking mile 1.5 directions to trailhead 3
- Parking mile 1.5 directions to trailhead 4
- Parking mile 1.6 directions to trailhead 5
- Parking mile 3 directions to trailhead 6
- Parking mile 3.5 directions to trailhead 7
- Parking mile 4.1 · restrooms directions to trailhead 8
- Parking mile 5.1 directions to trailhead 9
(opens in a new tab) About this trail
The Withlacoochee Bay Trail is a paved multi-use trail in Citrus County, Florida, at the western end of the Marjorie Harris Carr Cross Florida Greenway, which the Florida Department of Environmental Protection manages as part of the Florida State Parks system. The trail follows the route of the Cross Florida Barge Canal, which was planned to meet the Gulf at Withlacoochee Bay near Yankeetown. The U.S. Army Corps of Engineers began building the canal in February 1964; work was suspended in January 1971, about one-third complete, after a federal court injunction and an executive order from President Nixon. Congress deauthorized the canal in 1990, the state followed on January 22, 1991, and the land became the Cross Florida Greenway State Recreation and Conservation Area in 1991, renamed in 1998 for Marjorie Harris Carr, who had led the opposition to the canal.
The trail runs about 5 miles from a point facing the Gulf at Withlacoochee Bay east to the trailhead where U.S. 19 crosses the old barge canal south of Inglis, and on to Felburn Park just east of the highway. The eastern half follows the south bank of the canal; the western half follows the south berm of a spoil area to a peninsula on the Gulf, through maritime hammock and salt marsh. East of Felburn Park the pavement continues about 1.25 miles to near the meeting of the canal and the Withlacoochee River, which TrailLink counts in its 6.2-mile length. Across the river is the Inglis Dam Recreation Area.
The trail is 12 feet wide. An unpaved road open to public traffic runs beside most of it, reaching picnic shelters and fishing platforms, and horses are allowed on that road and side trails. Restrooms stand at three places along the trail, and Felburn Park has restrooms, water, picnic pavilions and a playground. The map line for this record measures about 6.2 miles.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- Old maps
USGS topographic maps of the trail's middle go back to the 1954 Gainesville sheet (1:250,000); the 1955 Yankeetown sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Aug 2024
- Crystal River Power Plant r/florida · Aug 2024 · 11 comments
- Crystal River Power Plant r/florida · Aug 2024 · 0 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/florida
Nearby trails
- Inglis Yankeetown Bike Path 0.6 mi away · 4.2 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 2117085, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Marjorie Harris Carr Cross Florida Greenway — Wikipedia · organization · checked Oct 16, 2026 Supports: greenway managed by Florida DEP as part of Florida State Parks, canal planned to reach Withlacoochee Bay near Yankeetown, construction from February 1964, January 1971 injunction and Nixon executive order, one-third complete, 1990 federal deauthorization, January 22, 1991 state deauthorization, 1991 establishment, 1998 renaming for Marjorie Harris Carr
- Withlacoochee Bay Trail – Cross Florida Greenway — Florida Nature Coast · organization · checked Oct 16, 2026 Supports: five miles from the Gulf to Felburn Park just east of US 19, 12-foot-wide paved trail, eastern half on the south bank of the canal and western part on the south berm of the spoil area to a Gulf peninsula, maritime hammock and salt marsh, unpaved road open to public traffic with picnic shelters and fishing platforms, restrooms in three locations, equestrian use on the unpaved road and side trails
- Withlacoochee Bay Trail — Discover Crystal River (Citrus County tourism) · web · checked Oct 16, 2026 Supports: trailhead on US 19 where it crosses the Cross Florida Barge Canal, Felburn Park to the east connects with the paved trail, five miles west to Withlacoochee Bay, parallel gravel road
- Withlacoochee Bay Trail — 100 Florida Trails · web · checked Oct 16, 2026 Supports: Felburn Park amenities, paved trail ends about 1.25 miles east of Felburn Park near the confluence of the barge canal and Withlacoochee River, Inglis Dam Recreation Area across the river
- Withlacoochee Bay Trail — TrailLink · web · checked Oct 16, 2026 Supports: 6.2 miles, Citrus County, south of Inglis
- OpenStreetMap ways for this trail — OpenStreetMap · web · checked Oct 16, 2026 Supports: length of the record's map line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.