States › Illinois

Woodridge Bikeway System

Greenway in Illinois · OpenStreetMap relation

Runs through Woodridge and Darien · DuPage and Will counties

Conditions now

Loading the weather near Woodridge…

Forecast by the National Weather Service for Woodridge · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
9.6 mi 15.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 71st Street mile 1.6 directions to trailhead 1
  2. Parking at Center Drive mile 2.1 directions to trailhead 2
  3. Parking at Woodridge Drive mile 2.1 directions to trailhead 3
  4. Parking at Frontage Road mile 2.5 directions to trailhead 4
  5. Parking at Woodridge Drive mile 3.3 directions to trailhead 5
  6. Parking at 83rd Street mile 4 directions to trailhead 6
  7. Parking at Heritage Parkway mile 7.3 directions to trailhead 7
Darien, along the trail (opens in a new tab)
Darien, along the trail · Photo: Hsully03 · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Woodridge Bikeway System is a network of off-road paths in the village of Woodridge in DuPage County, Illinois, offered by the Woodridge Park District and the Village of Woodridge. It is a set of connected local paths rather than a single linear trail.

The park district describes more than 21 miles of paths, built to connect village facilities, parks, forest preserves, neighborhoods and shopping areas, to link with regional bikeways, and to serve both recreational and commuting bicyclists. The paths connect with more than 100 miles of bikeways in surrounding communities. One segment, the Commonwealth Edison Bikeway, runs about 1.5 miles in an overhead power-line corridor owned by Commonwealth Edison between 63rd Street and Castaldo Park on 71st Street, with further connections along Hobson Road; Castaldo Park has parking and restrooms.

The paths are paved with asphalt. The park district publishes a downloadable bikeways map.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Wheaton 3 SE, 9 km from the trail's middle, 24 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333850627483868478655038
Low °F172028384958636254433223
Precipitation, in2.122.54.14.54.73.94.43.33.62.82.2
Snow, in9.35.14.50.30000000.94.2
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Joliet sheet (1:62,500); the 1954 Romeoville sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11634348, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Woodridge Bikeways System — Woodridge Park District · organization · checked Oct 14, 2026
    Supports: offered by the Woodridge Park District and Village of Woodridge; over 21 miles of off-road asphalt-paved paths; purposes (village facilities, parks, forest preserves, residential and commercial destinations, regional connections, alternative transportation); recreational and commuter bicyclists; links to more than 100 miles of bikeways in surrounding communities; downloadable bikeways map
  3. Commonwealth Edison Bikeway — TrailLink · web · checked Oct 14, 2026
    Supports: 1.5 miles; Commonwealth Edison utility corridor; 63rd St. to Castaldo Park at 71st St.; asphalt; connections at endpoints and along Hobson Road; parking and restrooms at Castaldo Park; DuPage County; non-rail greenway

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.