States › Michigan

Ada Township Trails

Greenway in Michigan

Runs through Forest Hills and Ada Township · Kent County

Conditions now

Loading the weather near Forest Hills…

Forecast by the National Weather Service for Forest Hills · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.0 mi 8.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Grand River Drive Northeast mile 1.1 directions to trailhead 1
  2. Parking at Grand River Drive Northeast mile 1.1 directions to trailhead 2
  3. Parking at Grand River Drive Northeast mile 2 · restrooms directions to trailhead 3
  4. Parking at Grand River Drive Northeast mile 2.1 · restrooms directions to trailhead 4
  5. Parking at Grand River Drive Northeast mile 3.9 directions to trailhead 5
  6. Parking at Fulton Street East mile 5.1 directions to trailhead 6
  7. Parking at Fulton Street East mile 5.2 directions to trailhead 7
  8. Parking at Fulton Street East mile 5.2 directions to trailhead 8
  9. Parking at Ada Depot Drive Southeast mile 5.2 directions to trailhead 9
Ada Township Trails drawn on the 1943 USGS topographic map of Grand Rapids, Michigan
Then: the 1943 USGS Grand Rapids sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Ada Township Trails is the title of Ada Township's trail map. The township, in Kent County, Michigan, says its trail system is made up of more than 25 miles of trails throughout the township. The line mapped here covers about 5 miles (8 km) of it, running from Knapp Street Northeast beside Grand River Drive Northeast and Fulton Street East to Ada Depot Drive Southeast. OpenStreetMap tags most of it as asphalt, with some concrete and several wooden boardwalk bridges.

The township's trails page names a Grand River Drive Trail and, in its Fall 2026 update, lists a project on it as completed in mid-summer. A township update describes that trail as a 4.5-mile (7.2 km) stretch from Fulton Street to Knapp Street, originally built in 2007, with a crush-and-shape project planned on it. The same Fall 2026 update lists the Thornapple River Pedestrian Bridge as open and the Knapp Street Pedestrian Bridge as under construction since late July, with completion expected in the fall of 2027; another township update describes that bridge as an elevated steel walkway of 1,750 feet (533 m).

Sources checked Oct 31, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Grand Rapids, 9.2 km from the trail's middle, 43 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444587079838174614736
Low °F192027374958626153423325
Precipitation, in2.52.12.4443.93.93.53.443.12.5
Snow, in22.617.27.62000000.37.120.8
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Grand Rapids sheet (1:62,500); the 1967 Grand Rapids East sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Trails — Ada Township, MI · organization · checked Oct 31, 2026
    Supports: trail system of more than 25 miles throughout the township; Fall 2026 Trails Update: Grand River Drive Trail project completed in mid-summer; Thornapple River Pedestrian Bridge open; Knapp Street Pedestrian Bridge construction began in late July, expected complete in fall 2027; Trail System Map dated September 1, 2024
  3. Trails Updates — Ada Township, MI · organization · checked Oct 31, 2026
    Supports: Grand River Drive Trail: 4.5-mile stretch from Fulton St. to Knapp St., originally constructed in 2007, to be crushed and shaped; Knapp Street Pedestrian Bridge a 1,750-foot elevated steel walkway (this page gives an August 2027 completion date)
  4. Ada Township Trails map, Kent County, Michigan — Ada Township, MI · organization · checked Oct 31, 2026
    Supports: the map is titled Ada Township Trails, Kent County, Michigan, and marks existing trails; the trails page dates it September 1, 2024
  5. Ada Township Trails — OpenStreetMap way 354607724 · web · checked Oct 31, 2026
    Supports: the mapped line: ways named Ada Township Trails tagged highway=cycleway or path, mostly surface=asphalt, a few concrete, and wood boardwalk bridges

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.