States › Michigan

Pettis Avenue Non-Motorized Trail

Greenway in Michigan

Runs through Forest Hills and Ada Township · Kent County

Conditions now

Loading the weather near Forest Hills…

Forecast by the National Weather Service for Forest Hills · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.0 mi 8.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Pettis Avenue Northeast mile 0.7 directions to trailhead 1
  2. Parking at Park Drive Northeast mile 4.1 directions to trailhead 2
  3. Parking at Auto Service Drive Southeast mile 4.9 directions to trailhead 3
  4. Parking at Auto Service Drive Southeast mile 4.9 directions to trailhead 4
  5. Parking at Pettis Avenue Southeast mile 4.9 directions to trailhead 5
Chief Hazy Cloud County Park (opens in a new tab)
Chief Hazy Cloud County Park · Photo: Gpwitteveen · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Pettis Avenue Non-Motorized Trail is a paved trail along Pettis Avenue NE in Ada Township, Kent County, Michigan, part of a township trail system that Ada Township says totals more than 25 miles. A January 2026 presentation to the Western Michigan Branch of the American Society of Civil Engineers described the recently completed Pettis Avenue trail as a 4.5-mile trail that provides a critical link in the Grand River Greenways trail network. The route mapped on this page runs about 5.0 miles, northwest along Pettis Avenue from near Auto Service Drive SE, southeast of Park Drive NE.

The trail filled a gap the township had identified in planning. Connect Ada, the township's non-motorized plan completed in February 2020, reported that many workshop participants called Pettis Avenue a notable gap in the existing network that was already commonly used by people biking. The plan listed Pettis Avenue trail segments from Knapp Street to 3 Mile Road and from Knapp Street to a planned river pedestrian bridge among its candidate projects, and ranked a Pettis Avenue trail from the pedestrian bridge to Fulton Street among its top projects.

Building the trail called for several kinds of retaining walls, among them an 800-foot-long soil-nailed wall. Work on the corridor continues to the north: in January 2026 Kent County Parks Director Ben Swayze described a Pettis Trail section of about 3.5 miles, from Cannonsburg Road to Knapp Street, as set to begin that spring as part of the Grand River Greenway, noting that the stretch of road is narrow, hilly and curving.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Grand Rapids, 9.8 km from the trail's middle, 42 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313444587079838174614736
Low °F192027374958626153423325
Precipitation, in2.52.12.4443.93.93.53.443.12.5
Snow, in22.617.27.62000000.37.120.8
Old maps

USGS topographic maps of the trail's middle go back to the 1914 Grand Rapids sheet (1:62,500); the 1967 Grand Rapids East sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Trails — Ada Township, Michigan · organization · checked Oct 15, 2026
    Supports: Ada Township trail system of more than 25 miles
  3. Connect Ada Final Report (February 2020) — Ada Township · organization · checked Oct 15, 2026
    Supports: Pettis Avenue described by workshop participants as a notable gap already commonly used by people biking; candidate projects Pettis Ave Knapp to 3 Mile and Knapp to River Pedestrian Bridge; Pettis Avenue Trail from Pedestrian Bridge to Fulton Street among top projects
  4. January 2026 ASCE Technical Luncheon — ASCE Western Michigan Branch · organization · checked Oct 15, 2026
    Supports: recently completed Pettis Avenue trail in Ada Township; 4.5 miles; critical link in the Grand River Greenways Trail network; retaining wall systems including an 800-foot soil-nailed wall
  5. Next phase of Grand River Greenway projects starts this spring — WGVU News (January 29, 2026) · organization · checked Oct 15, 2026
    Supports: Pettis Trail portion from Cannonsburg Road to Knapp Street, about 3.5 miles, set to begin in spring 2026; narrow, hilly, curving road; Kent County Parks Director Ben Swayze

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.