Ann & Roy Butler Hike and Bike Trail
Greenway in Texas · OpenStreetMap relation
Runs through Austin · Travis County
Conditions now
Loading the weather near Austin…
Forecast by the National Weather Service for Austin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Deep Eddy Avenue mile 0 · water directions to trailhead 1
- Zilker Park at MoPac mile 0.3 directions to Zilker Park at MoPac
- Parking at Stratford Drive mile 0.5 directions to trailhead 3
- Parking at Lou Neff Road mile 0.7 · water directions to trailhead 4
- Parking at Boat Launch mile 0.8 · water directions to trailhead 5
- Parking at Lou Neff Road mile 0.9 · water directions to trailhead 6
- Parking at Lou Neff Road mile 0.9 · water directions to trailhead 7
- Parking at West 3rd Street mile 1.3 · restrooms · water directions to trailhead 8
- Parking at West 3rd Street mile 1.3 · restrooms · water directions to trailhead 9
- Parking mile 1.3 · water directions to trailhead 10
- Pfluger Bridge Parking mile 1.7 · water directions to Pfluger Bridge Parking
- Pfluger Bridge Trailhead mile 1.7 · water directions to Pfluger Bridge Trailhead
- Parking at South Lamar Boulevard mile 1.7 · water directions to trailhead 13
- Doug Sahm Hill Parking mile 1.9 · restrooms · water directions to Doug Sahm Hill Parking
- Parking at West Cesar Chavez Street mile 1.9 · water directions to trailhead 15
- Trailhead at Lady Bird Lake mile 2 · water directions to Trailhead at Lady Bird Lake
- Auditorium Shores Trailhead mile 2.2 · restrooms · water directions to Auditorium Shores Trailhead
- Parking at West Riverside Drive mile 2.3 · water directions to trailhead 18
- Parking at South 1st Street mile 2.3 directions to trailhead 19
- Congress Avenue Trailhead mile 2.4 · water directions to Congress Avenue Trailhead
- Parking at South Congress Avenue mile 2.4 directions to trailhead 21
- Parking at South Congress Avenue mile 2.5 directions to trailhead 22
- Parking mile 2.7 directions to trailhead 23
- Rainey Street Trailhead mile 3 · restrooms · water directions to Rainey Street Trailhead
- Parking at South Interstate 35 mile 3.6 · water directions to trailhead 25
- Parking at San Marcos Street mile 3.6 directions to trailhead 26
- Edward Rendon Sr. Park Trailhead mile 3.9 · water directions to Edward Rendon Sr. Park Trailhead
- Parking at Nash Hernandez Senior Road mile 4.2 · water directions to trailhead 28
- Parking at Jesse E Segovia Street mile 4.4 · restrooms · water directions to trailhead 29
- Parking at Pedernales Street mile 4.9 · restrooms · water directions to trailhead 30
- Roy G. Guerrero Park Trailhead mile 5.2 · water directions to Roy G. Guerrero Park Trailhead
- Lakeshore / Pleasant Valley Road Trailhead mile 5.8 directions to Lakeshore / Pleasant Valley Road Trailhead
- Parking at South Lakeshore Boulevard mile 6.2 directions to trailhead 33
- International Shores Trailhead mile 6.3 · restrooms · water directions to International Shores Trailhead
- Parking at South Lakeshore Boulevard mile 6.4 directions to trailhead 35
- Parking at East Riverside Drive mile 6.4 directions to trailhead 36
- Parking at South Lakeshore Boulevard mile 6.4 · restrooms · water directions to trailhead 37
Plan your visit
- National Recreation TrailDesignated in 1975 National Recreation Trails database
- By trainAmtrak: Austin, TX (AUS) under 0.1 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).
(opens in a new tab) About this trail
The Ann and Roy Butler Hike-and-Bike Trail is a 10-mile loop around Lady Bird Lake, the reservoir on the Colorado River in downtown Austin, Texas. It is maintained by the Austin Parks and Recreation Department, and The Trail Conservancy, a nonprofit formed in 2003 as the Town Lake Trail Foundation, has been its primary steward since 2022, according to Wikipedia. The trail grew out of the Town Lake Beautification Committee, formed in 1971 under Mayor Roy Butler with Lady Bird Johnson as honorary chair; the Conservancy traces the idea to a 1971 meeting in London where Johnson and Ann Butler looked out over the Thames Path. Town Lake was renamed Lady Bird Lake in 2007, and the Town Lake Hike-and-Bike Trail took the Butlers' name in 2011.
The loop was completed in June 2014 by the Boardwalk at Lady Bird Lake, a 7,250-foot, $28 million structure along the south shore, built with city bonds and donations coordinated by the Conservancy. The boardwalk is open from 5 a.m. to midnight. On February 7, 2026, the city opened the Wishbone Bridge, a three-way, $25 million crossing that gives the trail a north-south link across the lake away from the sidewalks on Longhorn Dam. At the west end, the Roberta Crenshaw Pedestrian Walkway crosses the lake beneath MoPac Boulevard, and a pedestrian bridge carries the trail over Barton Creek.
Wikipedia gives the length as 10.1 miles, with 97.5 percent of it under an 8 percent grade and a surface mostly of crushed granite, with some concrete and the boardwalk. The Conservancy counts more than 5 million visits a year. Parking is at Festival Beach and other lots near the trail, and fishing is allowed at rest areas but not on the main trail. This record's map line measures about 15 miles, more than the loop itself, because it includes additional mapped paths around the lake.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Austin Bergstrom Airport, 10.3 km from the trail's middle, 13 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 62 66 73 80 87 93 96 97 91 82 72 64 Low °F 38 42 49 56 65 72 73 73 67 57 47 40 Precipitation, in 2.8 1.9 2.9 2.4 5 3.4 2.2 2.5 3 4.2 2.7 2.6 Snow, in 0 0.1 0 0 0 0 0 0 0 0 0 0.1 - On the National Register
- Lamar Boulevard Bridge, Austin · structure, listed 1994 · nomination file for Lamar Boulevard Bridge
- Austin Fire Drill Tower, Austin · building, listed 2016
- Town Lake Gazebo, Austin · structure, listed 2020
- Travis Heights-Fairview Park Historic District, Austin · historic district, listed 2021
- Fiesta Gardens, Austin · historic district, listed 2019
- Zilker Park Historic District, Austin · historic district, listed 1997 · nomination file for Zilker Park Historic District
- Deep Eddy Bathing Beach, Austin · historic district, listed 2003 · nomination file for Deep Eddy Bathing Beach
- Congress Avenue Historic District, Austin · historic district, listed 1978 · nomination file for Congress Avenue Historic District
- Rainey Street Historic District, Austin · historic district, listed 1985 · nomination file for Rainey Street Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1954 Austin East sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in October 2026 reported the trail closed past Cidercade heading east, with a poorly marked detour along East Riverside toward I-35; one said to rejoin past the underpass, another suggested Lakeshore Boulevard. r/Austin, Oct 2026
- In January 2025, riders said low lake levels exposed more litter along the trail and in the water; commenters pointed to volunteer cleanups run by the Trail Conservancy and Keep Austin Beautiful. r/Austin, Jan 2025
2 Reddit threads about this trail, Jan 2025 to Oct 2026
- Does anyone know where you rejoin the Hike and Bike trail after it detours right past Cidercade? r/Austin · Oct 2026 · 3 comments
- Trash Clean-Up r/Austin · Jan 2025 · 13 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationThe Trail Conservancy
- RedditSearch Reddit: r/texas
Nearby trails
- Lance Armstrong Crosstown Bikeway within 0.2 mi · 3.6 mi, paved
- Shoal Creek Trail within 0.2 mi · 3.0 mi, paved
- Johnson Creek Trail within 0.2 mi · 1.9 mi, paved
- Red Line Parkway Trail within 0.2 mi · 6.4 mi, paved
- Boggy Creek Trail 0.9 mi away · 1.4 mi, paved
- Southern Walnut Creek Trail 1.4 mi away · 9.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 14653827, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Ann and Roy Butler Hike-and-Bike Trail at Lady Bird Lake — Austin Parks and Recreation (AustinTexas.gov) · government source · checked Oct 15, 2026 Supports: 10-mile loop, Boardwalk completed June 2014, Wishbone Bridge completed 2026, boardwalk funding (2008 council funds, 2010 and 2012 bonds, donors coordinated by the Trail Conservancy), construction October 2012 to June 2014, $28 million, 7,250-foot boardwalk, hours 5am to midnight, boardwalk access points, parking at Festival Beach and on S. Lakeshore Blvd, fishing at rest areas only
- History of the Butler Trail — The Trail Conservancy · organization · checked Oct 15, 2026 Supports: more than 5 million visits a year, 1971 London meeting of Lady Bird Johnson and Ann Butler over the Thames Path, Town Lake Beautification Committee formed 1971, Town Lake Trail Foundation formed 2003 (now The Trail Conservancy), lake renamed 2007, trail renamed 2011
- Lady Bird Lake — Wikipedia · organization · checked Oct 15, 2026 Supports: Mayor Roy Butler and the Town Lake Beautification Committee with Lady Bird Johnson as honorary chair, maintained by Austin Parks and Recreation Department, Trail Conservancy primary steward since 2022, 10.1 miles, 97.5% under 8% grade, mostly crushed granite with concrete and boardwalk, Barton Creek pedestrian bridge, Roberta Crenshaw Pedestrian Walkway beneath MoPac, Wishbone Bridge opened February 7, 2026 for $25 million as a north-south link avoiding Longhorn Dam sidewalks
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.