States › Texas

Boggy Creek Trail

Greenway in Texas · OpenStreetMap relation

Runs through Austin · Travis County

Conditions now

Loading the weather near Austin…

Forecast by the National Weather Service for Austin · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Miriam Avenue mile 0.2 directions to trailhead 1
  2. Parking at Nile Street mile 1.3 directions to trailhead 2
  3. Parking at Webberville Road mile 1.4 directions to trailhead 3
Austin, along the trail (opens in a new tab)
Austin, along the trail · Photo: joncutrer · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Boggy Creek Trail is an urban trail of about 1.4 miles along Boggy Creek in East Austin, Texas, running from Webberville Road at Zaragosa Street north past Rosewood Avenue and East 12th Street to Alexander Avenue. It is a creek greenway, not a rail-trail; OpenStreetMap names its paths the Boggy Creek Greenbelt Trail and groups them as a local bicycle route called the Boggy Creek Trail.

In 2019 Austin Public Works, Austin Transportation and the Parks and Recreation Department proposed building a 12-foot-wide paved trail beside the existing 6-foot sidewalk between Rosewood Avenue and East 12th Street, so that people walking would be separated from people on bicycles and other wheeled devices. Construction of that section, described as Austin's first dual-track trail, was complete by February 2021. The section is part of the planned EastLink and Red Line trails and filled the last gap in its All Ages and Abilities Bicycle Network between the Cherrywood neighborhood and Lady Bird Lake.

OpenStreetMap shows the path as mostly concrete, with fine gravel and asphalt stretches and several bridges; at the north end it shares a stretch with the Red Line Parkway Trail.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Austin Bergstrom Airport, 10.4 km from the trail's middle, 6 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F626673808793969791827264
Low °F384249566572737367574740
Precipitation, in2.81.92.92.453.42.22.534.22.72.6
Snow, in00.10000000000.1
Old maps

USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1954 Austin East sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

8 Reddit threads about this trail, Feb 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17471716, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City proposes widening section of Boggy Creek Trail — Austin Monitor (July 2, 2019) · press · checked Oct 17, 2026
    Supports: 2019 proposal; 12-foot-wide paved trail beside the existing 6-foot sidewalk; Rosewood Avenue to East 12th Street; three city departments
  3. Construction now complete on Austin's first dual-track trail — FOX 7 Austin (February 9, 2021) · web · checked Oct 17, 2026
    Supports: dual-track section from Rosewood Avenue to East 12th Street complete; separation of walkers from people biking; Austin Public Works, Austin Transportation and Parks and Recreation; part of EastLink and Red Line trails; final gap in the All Ages and Abilities Bicycle Network between Cherrywood and Lady Bird Lake
  4. Boggy Creek Trail, relation 17471716 — OpenStreetMap · web · checked Oct 17, 2026
    Supports: route name Boggy Creek Trail (local cycle network); member ways named Boggy Creek Greenbelt Trail; concrete, fine gravel and asphalt surfaces; bridges; shared stretch with the Red Line Parkway Trail; extent from Webberville Road at Zaragosa Street to Alexander Avenue

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.