States › Arkansas

Appleblossom Trail

Greenway in Arkansas · OpenStreetMap relation

Runs through Bentonville · Benton County

Conditions now

Loading the weather near Bentonville…

Forecast by the National Weather Service for Bentonville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Northwest 3rd Street mile 0.8 · restrooms · water directions to trailhead 1
  2. Coler South Gateway mile 1 · restrooms · water directions to Coler South Gateway
  3. Coler North Gateway mile 2.5 directions to Coler North Gateway
Appleblossom Trail (opens in a new tab)
Photo: jpinar · CC BY-SA 4.0 · Mapillary

About this trail

Appleblossom Trail is a paved shared-use path of about 2.5 miles in Bentonville, Benton County, Arkansas, that connects toward the Coler Mountain Bike Preserve. In OpenStreetMap it is a bicycle route in the Bentonville local network named Appleblossom Trail, made up of 21 ways. The member ways are themselves named Applegate Trail; one of them is tagged as a 3.6-meter-wide concrete cycleway with a 15 mph speed limit and a bridge.

Komoot lists the path as Appleblossom Trail, and a Komoot comment from September 2022 calls it the Applegate Trail, a 2.5-mile connection to the Coler Mountain Bike Preserve and part of the Razorback Regional Greenway. The Razorback Regional Greenway is a primarily off-road shared-use system of about 40 miles linking Fayetteville, Springdale, Bentonville and other Northwest Arkansas towns; it was dedicated on May 2, 2015.

A 2022 Northwest Arkansas Democrat-Gazette report on Bentonville street projects refers to the Applegate Trailhead at Southwest Sims Drive and to protected bike lanes planned toward the Coler Mountain Bike Preserve. No Bentonville city page naming the Appleblossom Trail could be fetched.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bentonville 4 S, 6.8 km from the trail's middle, 28 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F465160697785899082715949
Low °F242736445463666557463627
Precipitation, in2.72.74.24.86.35.53.92.743.43.93.3
Snow, in3.22.32.600000000.21.2
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Fayetteville sheet (1:125,000); the 1954 Tulsa sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Look around

360° panorama: Appleblossom Trail (opens in a new tab)
  1. 360° view 1 of 6, photo by jpinar
  2. 360° view 2 of 6, photo by jpinar
  3. 360° view 3 of 6, photo by jpinar
  4. 360° view 4 of 6, photo by jpinar
  5. 360° view 5 of 6, photo by jpinar
  6. 360° view 6 of 6, photo by jpinar
360° panorama · Photo: jpinar · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12246345, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Razorback Greenway — Wikipedia · organization · checked Oct 18, 2026
    Supports: 40 miles, dedicated May 2, 2015
  3. OpenStreetMap relation 12246345 (Appleblossom Trail) · web · checked Oct 18, 2026
    Supports: relation name, Bentonville network, 21 member ways
  4. OpenStreetMap way 891102265 (Applegate Trail) · web · checked Oct 18, 2026
    Supports: member way name, concrete, width, speed limit, bridge
  5. Appleblossom Trail — Komoot · web · checked Oct 18, 2026
    Supports: name, comment calling it Applegate Trail, 2.5 miles, Coler, Greenway
  6. Work begins on protected bike lanes in Bentonville — Northwest Arkansas Democrat-Gazette (March 11, 2022) · web · checked Oct 18, 2026
    Supports: Applegate Trailhead at Southwest Sims Drive; Coler Mountain Bike Preserve

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.