Wishing Springs Trail
Greenway in Arkansas · OpenStreetMap relation
Runs through Bentonville · Benton County
Conditions now
Loading the weather near Bentonville…
Forecast by the National Weather Service for Bentonville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Northwest A Street mile 0 directions to trailhead 1
- Parking at Northwest A Street mile 0 directions to trailhead 2
- Parking at Northwest A Street mile 0 directions to trailhead 3
- Wishing Springs Trailhead mile 1.1 directions to Wishing Springs Trailhead
(opens in a new tab) About this trail
The Wishing Springs Trail is a paved path of about 1.5 miles in Bentonville, Arkansas, part of the Razorback Greenway. It starts near Bella Vista Lake Park, the northernmost point of Bentonville, and runs south toward town along McKissic Creek, connecting Lake Bella Vista to Slaughter Pen and the North Bentonville Trail. Visit Bentonville notes that the creek is a popular summer swimming spot.
The trail was cut off during construction of the Interstate 49 Bypass. A new bridge over a section of Town Branch Creek carried the hard-surface trail across the gap, and the city held a ribbon cutting on November 7, 2023. The Arkansas Department of Transportation and the Walton Family Foundation paid for the work.
In August 2025 the Bentonville City Council accepted a Walton Family Foundation grant of up to about $3.5 million to reroute about 1.5 miles of the greenway between Bella Vista Lake and Slaughter Pen after April 2022 flooding damaged the Red Iron Bridge. Construction was expected to run from October 2025 to October 2026.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Bentonville 4 S, 10.5 km from the trail's middle, 53 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 46 51 60 69 77 85 89 90 82 71 59 49 Low °F 24 27 36 44 54 63 66 65 57 46 36 27 Precipitation, in 2.7 2.7 4.2 4.8 6.3 5.5 3.9 2.7 4 3.4 3.9 3.3 Snow, in 3.2 2.3 2.6 0 0 0 0 0 0 0 0.2 1.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1899 Fayetteville sheet (1:125,000); the 1954 Tulsa sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Look around
Nearby trails
- Razorback Regional Greenway within 0.2 mi · 17.8 mi, paved
- Lake Bella Vista Trail within 0.2 mi · 1.5 mi, paved
- North Bentonville Trail within 0.2 mi · 3.2 mi, paved
- North Walton Blvd Trail 0.5 mi away · 1.7 mi, paved
- Blowing Springs Greenway 0.9 mi away · 3.4 mi, paved
- Appleblossom Trail 1.5 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10722532, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Wishing Spring Trail in Bentonville back in business - Northwest Arkansas Democrat-Gazette · web · checked Oct 18, 2026 Supports: I-49 Bypass disconnection, new bridge, November 7, 2023 ribbon cutting, funders
- Bentonville accepts up to $3.5 million from Walton Family Foundation for trail relocation project - Northwest Arkansas Democrat-Gazette · web · checked Oct 18, 2026 Supports: 2025 relocation grant, flood damage, route, construction dates
- Razorback Greenway Experience Guide - Visit Bentonville · web · checked Oct 18, 2026 Supports: route from Bella Vista Lake Park along McKissic Creek, swimming, paved greenway
- OpenStreetMap relation 10722532 · web · checked Oct 18, 2026 Supports: trail name, route, mapped length and surface
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.