States › California

Arcade Cripple-Creek Trail

Greenway in California

Runs through Citrus Heights and Orangevale · Sacramento County

Conditions now

Loading the weather near Orangevale…

Forecast by the National Weather Service for Orangevale · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.1 mi 5.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Oak Avenue mile 0.8 directions to trailhead 1
  2. Parking at Oak Avenue mile 0.8 directions to trailhead 2
  3. Parking at Sunrise Boulevard mile 2.8 directions to trailhead 3
Citrus Heights, along the trail (opens in a new tab)
Citrus Heights, along the trail · Photo: ray_explores · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Arcade-Cripple Creek Trail is a 2.9-mile paved multi-use trail in Citrus Heights, California, with a short stretch in the unincorporated community of Orangevale in Sacramento County. It is the first city-wide trail in Citrus Heights. The City of Citrus Heights built it with the Sunrise Recreation and Park District, the Orangevale Recreation and Park District, the San Juan Unified School District, Sacramento County and SMUD. A feasibility study began in 2014, the city adopted a Bikeway Master Plan in 2015, funding was secured in 2017, design started in 2018, and construction began in 2022 at Arcade Creek Park Preserve. A grand opening was scheduled for May 5, 2024, at Tempo Park.

The trail runs from Arcade Creek Park Preserve in the west to Wachtel Way in the east, crossing Arcade Creek and Cripple Creek. It passes through six Citrus Heights parks, including Mitchell Village Park, briefly enters two Orangevale parks and connects to the back of Tempo Park. It joins an existing one-third-mile trail in Arcade Creek Park Preserve; with that trail and the Mitchell Village section, the paths total over 4 miles. The trail is part of the SACOG Regional Trail Network and was described at its opening as a step toward a connection with the American River Parkway. This record maps about 3.1 miles of the route.

The project included two pre-engineered steel pedestrian bridges, a 42-foot replacement pedestrian bridge and a new 128-foot pedestrian bridge near the end of the trail, along with curb, gutter, sidewalk, drainage and traffic signal work. The construction manager put the project cost at $8.6 million. The trail links neighborhoods with eight parks, several schools and the Sunrise MarketPlace.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Sacramento 5 ESE, 20.6 km from the trail's middle, 45 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566268748189949489796556
Low °F414447495459616159534541
Precipitation, in3.93.62.81.40.90.2000.10.91.83.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1951 Citrus Heights sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Grand opening of new 2.9-mile trail in Citrus Heights set for May — Citrus Heights Sentinel (April 6, 2024) · web · checked Oct 16, 2026
    Supports: 2.9 miles; Arcade Creek Park Preserve to Wachtel Way; crosses Arcade and Cripple creeks; six Citrus Heights parks including Mitchell Village Park, two Orangevale parks, back of Tempo Park; one-third-mile trail in Arcade Creek Park Preserve, over four miles total; partners; timeline 2014 feasibility, 2015 Bikeway Master Plan, 2017 funding, 2018 design, 2022 construction start; SACOG Regional Trail Network; step toward American River Parkway; grand opening May 5 at Tempo Park
  3. Arcade-Cripple Creek Trail — DCCM (March 11, 2026) · web · checked Oct 16, 2026
    Supports: first city-wide trail in Citrus Heights; 2.9-mile paved multi-use trail; Citrus Heights and unincorporated Orangevale, Sacramento County; curb, gutter, sidewalk, drainage and traffic signal work; two pre-engineered steel pedestrian bridges, 42-foot replacement bridge, new 128-foot bridge near the trail end; $8.6 million project cost; links neighborhoods with eight parks, several schools and the Sunrise MarketPlace
  4. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: record length about 3.1 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.