States › California

False Ravine Trail

Greenway in California

Runs through Roseville · Placer County

Conditions now

Loading the weather near Roseville…

Forecast by the National Weather Service for Roseville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.8 mi 2.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Rocklin, along the trail (opens in a new tab)
Rocklin, along the trail · Photo: T71024 · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The False Ravine Trail is a paved Class I bike path in the Stoneridge area of northeast Roseville, California, built as a branch of the Miners Ravine Bike Path. Roseville's 2008 Bicycle Master Plan lists the False Ravine branch "into Rocklin" among the off-street paths the city built between 2002 and 2007, and counts it as one of three bike path connections into Rocklin. The Stoneridge Specific Plan called for Class I trails within Miners Ravine, Secret Ravine and False Ravine, and a 2025 review of existing plans prepared for the city's Active Transportation Plan says those trails are complete.

The record maps about 1.8 miles of path through the ravine, from Scarborough Drive at the Rocklin line southwest toward the Miners Ravine Trail. OpenStreetMap shows asphalt designated for bicycles and pedestrians, and marks one short spur as a private connector to a gated community with no public access. A 2023 Komoot listing describes the trail as a 4.3-mile out-and-back ride, smooth and paved and lined with oaks, that connects to the Miners Ravine Trail.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Sacramento 5 ESE, 28 km from the trail's middle, 69 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566268748189949489796556
Low °F414447495459616159534541
Precipitation, in3.93.62.81.40.90.2000.10.91.83.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1954 Rocklin sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. 2008 Bicycle Master Plan — City of Roseville · government source · checked Oct 17, 2026
    Supports: False Ravine branch of the Miners Ravine Bike Path into Rocklin built 2002-2007; one of three bike path connections into Rocklin
  3. Appendix B: Plan Review (memorandum, March 26, 2025), Roseville Active Transportation Plan — City of Roseville · government source · checked Oct 17, 2026
    Supports: Stoneridge Specific Plan Class I trails within Miners Ravine, Secret Ravine and False Ravine; those trails complete; Stoneridge in northeast Roseville bounded by Rocklin
  4. OpenStreetMap ways named False Ravine Trail (e.g. way 32998893; private spur way 32999096) — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: extent of mapped path; Scarborough Drive end; asphalt; bicycle and foot designated; private connector spur
  5. False Ravine Trail – Cycling Routes — Komoot · web · checked Oct 17, 2026
    Supports: 4.3-mile out-and-back; smooth, paved, oak trees; connects to Miners Ravine Trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.