B&O Trail
Rail-trail in Indiana · OpenStreetMap relation
Runs through Brownsburg, Indianapolis and Speedway · Vermillion, Hendricks and Marion counties
Conditions now
Loading the weather near Pittsboro…
Forecast by the National Weather Service for Pittsboro · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Tilden Trailhead mile 2.2 directions to Tilden Trailhead
- Parking at South Green Street mile 4.2 directions to trailhead 2
- Parking at South Green Street mile 4.2 directions to trailhead 3
- Parking at Donnelly Drive mile 4.2 directions to trailhead 4
- Parking at North Clubside Place mile 9.6 directions to trailhead 5
- Parking at Maradona Drive mile 10.1 directions to trailhead 6
- Parking at Benoit Drive mile 10.3 directions to trailhead 7
- Parking at Portsmouth Avenue mile 12.1 directions to trailhead 8
- Parking at Portsmouth Avenue mile 12.1 directions to trailhead 9
- Leonard Park lot mile 12.2 directions to Leonard Park lot
- Parking at North Whitcomb Avenue mile 12.2 directions to trailhead 11
- Parking at Portsmouth Avenue mile 12.2 directions to trailhead 12
- Parking at West 13th Street mile 12.7 directions to trailhead 13
- Parking at West 13th Street mile 12.7 directions to trailhead 14
- Parking at West 11th Street mile 13 directions to trailhead 15
- Parking at Loy Street mile 13 directions to trailhead 16
- Parking at West 10th Street mile 13.1 directions to trailhead 17
- Parking at Ford Street mile 13.1 directions to trailhead 18
- Parking at Gilman Street mile 13.1 directions to trailhead 19
- Parking at Gilman Street mile 13.1 directions to trailhead 20
- Parking at Main Street mile 13.1 directions to trailhead 21
- Parking at Main Street mile 13.1 directions to trailhead 22
- Parking at Main Street mile 13.1 directions to trailhead 23
- Parking at Main Street mile 13.1 directions to trailhead 24
- Parking at West 10th Street mile 13.2 directions to trailhead 25
- Parking at Allison Way mile 13.3 directions to trailhead 26
- Parking at West 10th Street mile 13.4 directions to trailhead 27
- Parking at North Tibbs Avenue mile 14.4 directions to trailhead 28
- Parking at North Alton Avenue mile 14.4 directions to trailhead 29
- Parking at West Saint Clair Street mile 14.5 directions to trailhead 30
- Parking at North Tibbs Avenue mile 14.5 directions to trailhead 31
- Parking at North Concord Street mile 14.7 directions to trailhead 32
- Parking at West Walnut Street mile 14.9 directions to trailhead 33
- Parking at West Michigan Street mile 14.9 directions to trailhead 34
- Parking at West Michigan Street mile 15 directions to trailhead 35
- Parking at Haugh Street mile 15 directions to trailhead 36
- Parking at West Michigan Street mile 15 directions to trailhead 37
- Parking at West Michigan Street mile 15 directions to trailhead 38
(opens in a new tab) About this trail
The B&O Trail is a paved rail-trail on the abandoned Baltimore and Ohio Railroad corridor on the west side of Indianapolis, running from the Haughville neighborhood through the town of Speedway and west across Hendricks County through Brownsburg. Two volunteer nonprofits built it: the B&O Trail Association, formed in 1993 to create a recreational trail on the corridor, and the Speedway Trails Association, established in 2007. The effort began after a 1992 meeting in Speedway; supporters studied 65 miles of abandoned line through Marion, Hendricks, Putnam and Parke counties, and in 2005 16 miles of the abandoned CSX line in Hendricks County were purchased.
Construction in Hendricks County began in 2007, on sections from Raceway Road to Ronald Reagan Parkway and from County Road 300 North to State Road 267, now Green Street, in Brownsburg. Two more miles west of Green Street, with a bridge over White Lick Creek, were built from 2016. The association has completed 8.2 miles of paved trail in Hendricks County and is finishing a trailhead at County Road 500 East just west of Brownsburg. In Marion County the Speedway Trails Association first built 3 miles from Michigan Street to High School Road; a 1.9-mile extension opened in June 2023 added 1.7 miles east from Allison Way to Michigan Street in Haughville and a bridge over Eagle Creek, and a 1.0-mile protected bike lane on Michigan Street was planned as the link toward downtown.
In October 2025 the state and both groups opened extensions totaling more than 6.1 miles of asphalt, paid for with two state-administered grants totaling $9,166,100, closing the 3-mile gap between Speedway and Hendricks County. The result, by the Speedway group's count, is nearly 17 miles of continuous trail from the Indianapolis Cultural Trail through Speedway into central Hendricks County. The B&O Trail Association's stated aim is a continuous trail from the White River in downtown Indianapolis to west of the Wabash River.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Indianapolis Eagle Creek Airport, 7.1 km from the trail's middle, 15 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 41 52 64 74 82 85 84 78 66 52 41 Low °F 21 24 33 43 54 63 67 65 57 45 35 26 Precipitation, in 2.6 2.1 3.3 4.1 4.3 5.1 4.3 3.2 2.6 3.2 3.2 2.7 - On the National Register
- Haughville Historic District, Indianapolis · historic district, listed 1992 · nomination file for Haughville Historic District
- Speedway Historic District, Speedway · historic district, listed 2005 · nomination file for Speedway Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1953 Brownsburg sheet (1:24,000); the 1959 Brownsburg sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationB&O Trail Association
- FacebookB&O Trail Association (Facebook)
- RedditSearch Reddit: r/Indiana
Nearby trails
- Ronald Reagan Parkway Trail within 0.2 mi · 14.5 mi, paved
- Bicentennial Trail within 0.2 mi · 2.0 mi, paved
- White River Wapahani Trail 0.9 mi away · 8.2 mi, paved
- Eagle Creek Trail 1.3 mi away · 5.1 mi, paved
- Indianapolis Cultural Trail 1.4 mi away · 7.1 mi, paved
- Fall Creek Trail 1.7 mi away · 14.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9715911, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- B&O Trail opens in Hendricks County, Speedway — State of Indiana (Indiana DNR release, October 9, 2025) · government source · checked Oct 15, 2026 Supports: October 2025 ribbon cutting; more than 6.1 miles of asphalt built by BOTA and STA with two DNR-administered grants totaling $9,166,100; BOTA formed 1993 as an all-volunteer nonprofit on the abandoned B&O Railroad corridor; 8.2 miles paved in Hendricks County; trailhead at County Road 500E west of Brownsburg; STA established 2007 and earlier built 3 miles from Michigan Street to High School Road; 8 miles in Marion County; 3-mile gap closed; nearly 17 miles of continuous trail linking the Indianapolis Cultural Trail through Speedway into central Hendricks County; goal of a trail from the White River downtown to west of the Wabash River
- B&O Trail opens, connects town of Speedway to Indianapolis — State of Indiana (Indiana DNR release, June 6, 2023) · government source · checked Oct 15, 2026 Supports: 1.9-mile asphalt extension by STA with a $4.9 million Next Level Trails grant; eastern extension of 1.7 miles from Allison Way to Michigan Street in Haughville; Eagle Creek bridge and 0.2 mile west to High School Road; planned 1.0-mile protected bike lane on Michigan Street toward downtown
- B&O Trail Association - B&O Trail Association, Inc. · organization · checked Oct 15, 2026 Supports: connection between Brownsburg and Speedway completed; trail safety with the Brownsburg Parks Department
- Trailblazing: The B&O Trail Continues to Grow — Towne Post Network · press · checked Oct 15, 2026 Supports: 1992 Speedway meeting; 65 miles of abandoned line through Marion, Hendricks, Putnam and Parke counties; 2005 purchase of 16 miles of abandoned CSX railroad in Hendricks County; 2007 construction from Raceway Road to Ronald Reagan Parkway and 300N to SR 267 (now Green Street); two miles west of Green Street from summer 2016 with a bridge over White Lick Creek
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.