Ronald Reagan Parkway Trail
Greenway in Indiana · OpenStreetMap relation
Runs through Brownsburg, Avon and Plainfield · Hendricks County
Conditions now
Loading the weather near Avon…
Forecast by the National Weather Service for Avon · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Ronald Reagan Parkway mile 0.6 directions to trailhead 1
- Parking at Plainfield Road mile 0.7 directions to trailhead 2
- Parking at Plainfield Road mile 0.7 directions to trailhead 3
- Parking at Ronald Reagan Parkway mile 1.4 directions to trailhead 4
- Parking at East County Road 100 South mile 3.6 directions to trailhead 5
- Parking at Gipper Way mile 9.5 directions to trailhead 6
- Parking at Gipper Way mile 9.6 directions to trailhead 7
- Parking at Gipper Way mile 9.6 directions to trailhead 8
- Parking at Lacy Knot Drive mile 9.6 directions to trailhead 9
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Ronald Reagan Parkway Trail is a paved path beside the Ronald Reagan Parkway, a north-south parkway in Hendricks County, Indiana, that begins at the Indianapolis airport interchange on Interstate 70. It is not a rail-trail: the path has been built alongside the parkway as the road was extended in stages. The parkway's first one-mile section, from US 36 to County Road 100 North, was completed in 1996; it reached US 40 in the early 2000s, was extended from County Road 200 North to County Road 300 North in early 2015, and from there to US 136 in late 2017. Phase 1A, which opened in November 2025, extended it to County Road 750 North in Brownsburg.
TrailLink describes a 3.2-mile asphalt section in Avon that runs south from County Road 300 North, connects to the B&O Trail through an underpass, passes West Hospital and becomes more residential past County Road 100 North before ending at Rockville Road. The 2025 extension, just over 1.5 miles between 56th Street and County Road 750 North, added a 10-foot multiuse path on the east side of the road for pedestrians and cyclists, alongside a bridge over the CSX railroad tracks. The mapped line on this page, drawn from OpenStreetMap, runs about 14.5 miles from near Interstate 70 north to County Road 750 North and takes its name from that map.
Hendricks County approved bids in November 2025 for Phase 1B, which extends the parkway from County Road 750 North to County Road 1000 North; county leaders plan for the road eventually to run from Interstate 70 in Hendricks County to Interstate 65 in Boone County.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Indianapolis Eagle Creek Airport, 6.2 km from the trail's middle, 5 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 41 52 64 74 82 85 84 78 66 52 41 Low °F 21 24 33 43 54 63 67 65 57 45 35 26 Precipitation, in 2.6 2.1 3.3 4.1 4.3 5.1 4.3 3.2 2.6 3.2 3.2 2.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1953 Clermont sheet (1:24,000); the 1959 Clermont sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Indiana
Nearby trails
- B&O Trail within 0.2 mi · 15.6 mi, paved
- Vandalia Trail within 0.2 mi · 17.8 mi, paved
- Bicentennial Trail 0.9 mi away · 2.0 mi, paved
- Clark Creek Trail 1.4 mi away · 3.1 mi, paved
- Southwest Trail 2.0 mi away · 2.9 mi, crushed stone
- Northtown Trail 3.7 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 20421324, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Ronald Reagan Parkway (Indiana) — Wikipedia · organization · checked Oct 15, 2026 Supports: Ronald Reagan Parkway begins at I-70 exit 68 with its connection to Indianapolis International Airport; parkway in Marion and Hendricks counties; first one-mile section US 36 to CR 100 N completed 1996; to US 40 early 2000s; CR 200 N to CR 300 N early 2015; CR 300 N to US 136 late 2017; Phase 1A to CR 750 N opened November 2025; Phase 1B to CR 1000 N
- Hendricks County celebrates opening of Ronald Reagan Parkway extension — Current Publishing (November 23, 2025) · web · checked Oct 15, 2026 Supports: Phase 1A ribbon cutting November 14, 2025; just over 1.5 miles between 56th Street and CR 750 North in Brownsburg; bridge over CSX tracks; 10-foot multiuse path on the east side for pedestrians and cyclists; Phase 1B bids approved for CR 750 N to CR 1000 N; goal of I-70 to I-65 in Boone County
- Ronald Reagan Parkway Trail — TrailLink (Rails to Trails Conservancy) · web · checked Oct 15, 2026 Supports: 3.2-mile asphalt path in Avon from CR 300 N south to Rockville Road; underpass connection to the B&O Trail; access to West Hospital; residential past CR 100 N
- Ronald Reagan Parkway Trail — OpenStreetMap relation 20421324 · web · checked Oct 15, 2026 Supports: trail name; mapped extent of about 14.5 miles from near I-70 to CR 750 N
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.