B2B Trail (Chelsea-Dexter Section)
Greenway in Michigan
Runs through Chelsea and Lima Township · Washtenaw County
Conditions now
Loading the weather near Chelsea…
Forecast by the National Weather Service for Chelsea · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Dexter Chelsea Road mile 1.5 directions to trailhead 1
- Parking at North Parker Road mile 5.8 directions to trailhead 2
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
This record maps about 4.4 miles of the Border-to-Border (B2B) Trail in Washtenaw County, Michigan, along Dexter-Chelsea Road between Chelsea and Parker Road west of Dexter. The Washtenaw County Parks & Recreation Commission owns and maintains this paved, road-separated stretch, which runs parallel to the Amtrak tracks on an old interurban railroad grade that once linked Dexter, Chelsea and Grass Lake. A 0.7-mile piece from Wylie Road past Parker Road was completed in August 2024. A 1.4-mile gap between Dancer and Lima Center roads remains, and a nearly one-mile link from Miller-Smith Preserve into downtown Dexter, crossing Mill Creek on the restored Bell Road Bridge, was under construction in 2026. The trail is not maintained in winter.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chelsea, 6.1 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 70 79 82 80 74 61 47 36 Low °F 16 17 25 37 48 56 61 59 51 40 31 23 Precipitation, in 2.4 2 2.2 3 3.8 3.6 3.5 3.6 2.7 3.1 2.6 2.1 Snow, in 10.9 8.6 4.7 0.9 0 0 0 0 0 0 1.8 6 - Old maps
USGS topographic maps of the trail's middle go back to the 1902 Dexter sheet (1:62,500); the 1964 Dexter sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBorder to Border Trail (WCPARC and Huron Waterloo Pathways Initiative)
- Agency noticesB2B Trail construction updates
- FacebookBorder to Border Trail (Facebook)
Nearby trails
- Dexter-Hudson Mills Washtenaw B2B Trail Section 0.6 mi away · 4.4 mi, paved
- Border to Border Trail 0.7 mi away · 7.8 mi, paved
- B2B Trail (Dexter Section) 1.1 mi away · 1.5 mi, paved
- B2B Trail 3.2 mi away · 8.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Chelsea-Dexter Corridor — Border to Border · organization · checked Oct 15, 2026 Supports: paved road-separated path, parallels Amtrak tracks along Dexter-Chelsea Road, old interurban grade linking Dexter, Chelsea and Grass Lake, owned and maintained by WCPARC, not maintained in winter
- Dexter-Chelsea Road between Wylie and Parker — Border to Border · organization · checked Oct 15, 2026 Supports: 0.7 miles from Wylie Road past Parker Road completed August 2024
- Downtown Dexter Connection — Border to Border · organization · checked Oct 15, 2026 Supports: 1.4-mile gap Dancer Road to Lima Center Road; nearly one-mile Miller-Smith Preserve to downtown Dexter link under construction in 2026, Bell Road Bridge over Mill Creek
- OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 15, 2026 Supports: record extent: about 4.4 miles between Chelsea and Parker Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.