Border to Border Trail
Greenway in Michigan
Runs through Lyndon Township, Sylvan Township (Washtenaw County) and Chelsea · Washtenaw County
Conditions now
Loading the weather near Chelsea…
Forecast by the National Weather Service for Chelsea · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Border-to-Border (B2B) Trail is a partially constructed non-motorized trail system in Washtenaw County, Michigan. The system is planned to cover approximately 55 miles (89 km) across Washtenaw County, along the Huron River.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sibley Road mile 0.1 · restrooms directions to trailhead 1
- Parking at Sibley Road mile 0.1 · restrooms directions to trailhead 2
- Parking at F A Weber Drive mile 0.4 · water directions to trailhead 3
- Parking at North Main Street mile 1 directions to trailhead 4
- Parking at Stockbridge Chelsea Road mile 1.4 directions to trailhead 5
- Parking at Stockbridge Chelsea Road mile 2.7 directions to trailhead 6
- Parking at Stockbridge Chelsea Road mile 5.6 · restrooms · water directions to trailhead 7
- Parking at Stockbridge Chelsea Road mile 5.6 · restrooms · water directions to trailhead 8
- Parking at Stockbridge Chelsea Road mile 5.6 · restrooms · water directions to trailhead 9
- Parking at North Territorial Road mile 6 · restrooms · water directions to trailhead 10
- Parking at North Territorial Road mile 6 · restrooms · water directions to trailhead 11
- Parking at Roepke Road mile 6.4 directions to trailhead 12
About this trail
This record maps about 7.8 miles of the Border-to-Border (B2B) Trail, the Washtenaw County, Michigan, trail overseen by Washtenaw County Parks & Recreation and the Huron Waterloo Pathways Initiative, on its branch north from Chelsea toward the county line. A 2.6-mile segment from Werkner Road and M-52 to the DNR's Green Lake Campground opened in December 2018. In 2020 a 2.1-mile segment carried it on to North Territorial Road, with a 50-space trailhead beside Lyndon Township Hall and a tunnel under M-52 at Green Lake. In October 2022 a section from Chelsea's Timbertown Park to Werkner Road completed a 6.3-mile path from Chelsea; 1.5 more miles to Boyce Road were planned for 2023.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
23% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Chelsea, 5.3 km from the trail's middle, 19 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 31 34 44 58 70 79 82 80 74 61 47 36 Low °F 16 17 25 37 48 56 61 59 51 40 31 23 Precipitation, in 2.4 2 2.2 3 3.8 3.6 3.5 3.6 2.7 3.1 2.6 2.1 Snow, in 10.9 8.6 4.7 0.9 0 0 0 0 0 0 1.8 6 - Old maps
USGS topographic maps of the trail's middle go back to the 1919 Stockbridge sheet (1:62,500); the 1942 Stockbridge sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Aug 2024 to May 2025
- New Border-to-Border Trail tunnel pathway to be complete by 2025 r/AnnArbor · Aug 2024 · 17 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBorder to Border Trail (WCPARC and Huron Waterloo Pathways Initiative)
- RedditSearch Reddit: r/Michigan
Nearby trails
- B2B Trail (Chelsea-Dexter Section) 0.7 mi away · 4.4 mi, paved
- Lakelands Trail 4.4 mi away · 41.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Border-to-Border Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q4944522, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- 2.6 New B2B Miles Open on December 8! — Border to Border Trail (November 30, 2018) · organization · checked Oct 15, 2026 Supports: 2.6-mile segment from Werkner Road and M-52 north of Chelsea to the DNR's Green Lake Campground entrance; HWPI and WCPARC
- New B2B Trail Segment Officially Open — Border to Border Trail (December 11, 2018) · organization · checked Oct 15, 2026 Supports: segment opened with a December 2018 ribbon cutting
- 2020 – A Year of Trail Growth — Border to Border Trail (December 30, 2020) · organization · checked Oct 15, 2026 Supports: 2.1-mile segment from Green Lake Campground to North Territorial Road; 50-space trailhead near North Territorial Road and M-52 by Lyndon Township Hall; M-52 tunnel at Green Lake
- New B2B Segment Completes Pathway — Chelsea Area Chamber of Commerce (November 8, 2022) · web · checked Oct 15, 2026 Supports: Timbertown Park to Werkner Road section opened October 26; overseen by Washtenaw County Parks & Rec and HWPI; 6.3-mile path from Chelsea to Lyndon Township Hall; 2023 plan to extend 1.5 miles north to Boyce Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.