Bay Colony Rail Trail

Rail-trail in Massachusetts

Runs through Medfield · Norfolk County

Conditions now

Loading the weather near Medfield…

Forecast by the National Weather Service for Medfield · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Bay Colony Rail Trail (BCRT) is a partially completed rail trail in Newton, Needham, Dover, and Medfield, Massachusetts. It has 4 miles (6.4 km) open and when completed it will be 7 miles (11 km). It is made up of 4 rail trails, the Newton Upper Falls Greenway, the Needham Rail Trail, the Dover Greenway, and the Medfield Rail Trail. Named for the former Bay Colony Railroad, the Massachusetts Bay Transportation Authority (MBTA) owns the right of way (ROW) and leases the trail to the municipalities. Most of the BCRT was once the Millis Branch, except the Upper Falls Greenway which was once the Charles River Branch Railroad that connected to the Highland Branch. The Bay Colony Rail Trail Association is a 501(c)(3) nonprofit dedicated to the dedicated to the development, maintenance and promotion of the BCRT.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
1.3 mi 2.1 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Ice House Road mile 0 directions to trailhead 1
  2. Parking at Farm Street mile 1 directions to trailhead 2
Bay Colony Rail Trail north of Charles River Street, April 2016.JPG (opens in a new tab)
Bay Colony Rail Trail north of Charles River Street, April 2016.JPG · Photo: Pi.1415926535 · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Bay Colony Rail Trail is a partially built multi-use trail on the former Bay Colony Railroad corridor through Medfield, Dover and Needham, Massachusetts, with the Upper Falls Greenway in Newton as a partner trail. About 4 miles are open of a planned total of about 7; the mapped sections, about 3 miles, are the open Medfield and Needham segments. The Massachusetts Bay Transportation Authority owns the right-of-way and leases it to the towns, which maintain their segments. The Bay Colony Rail Trail Association, a nonprofit, works to define, design, build and maintain the trail.

Most of the corridor was the Millis Branch. Commuter service on it had ended by 1967, and a 1998 Boston Region Metropolitan Planning Organization study found that restoring commuter rail between Needham Junction and Millis would not be cost-effective. The Bay Colony Railroad ceased operating between Medfield and Newton in 2008 and gave up its lease, returning control to the MBTA. Needham's section opened in 2016 on a 99-year lease at no cost. Medfield signed its lease in 2021 and built its section with state MassTrails grants and private donations; a ribbon cutting was held on October 1, 2022.

The Medfield Rail Trail runs 1.3 miles from Ice House Road to the Dover town line. The Needham section runs 1.7 miles from Needham Junction through the Needham Town Forest to the Charles River, with parking along High Rock Street and in public lots off Fisher Street; dogs must be leashed. Both have stone-dust surfaces. The roughly 3-mile Dover segment between them, beside Center Street from the Medfield line to the Charles River, has not been built. Dover received a MassTrails design grant in 2024, and a $260,000 MassTrails award in 2026 is to complete shovel-ready plans for the link between the Medfield and Needham sections.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 100% of this route as an out-of-service rail line.

Shade

76% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Walpole 2, 7.8 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374047597078838274625142
Low °F202128384857636254433425
Precipitation, in3.93.44.84.43.64.23.643.754.15
Snow, in15.114.111.62.5000000.31.710.8
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Franklin sheet (1:62,500); the 1957 Medfield sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Bay Colony Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q132645444, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Bay Colony Rail Trail — Wikipedia · organization · checked Oct 13, 2026
    Supports: towns, 4 miles open of 7, MBTA ownership and leases, town maintenance, Millis Branch, 1967, 1998 study, 2008 end of Bay Colony Railroad operations, Needham 2016 opening and 99-year lease, Medfield 2021 lease, Dover route along Center Street and 2024 design grant, stone dust
  5. Trail FAQs — Bay Colony Rail Trail Association · organization · checked Oct 13, 2026
    Supports: association's mission, segment lengths, Upper Falls Greenway as partner trail
  6. Needham Rail Trail — Bay Colony Rail Trail Association · organization · checked Oct 13, 2026
    Supports: Needham 1.7 miles, Needham Junction to Charles River, stone dust, parking, leashed dogs
  7. Ribbon Cutting Ceremony on Oct 1 for the Medfield Rail Trail — Bay Colony Rail Trail Association · organization · checked Oct 13, 2026
    Supports: Medfield 1.3 miles, Ice House Road to Dover line, MassTrails and private funding, October 1, 2022 ribbon cutting
  8. Healey Administration Awards $8.6 Million in MassTrails Grants — Streetsblog Massachusetts · press · checked Oct 13, 2026
    Supports: 2026 $260,000 grant for shovel-ready Dover design linking Medfield and Needham

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.