Upper Charles Trail

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Sherborn, Holliston and Milford · Middlesex and Worcester counties

Conditions now

Loading the weather near Milford…

Forecast by the National Weather Service for Milford · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
13.7 mi 22.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Millstone Drive mile 0 directions to trailhead 1
  2. Placentino School Parking mile 2.5 directions to Placentino School Parking
  3. Adams School Parking mile 2.6 directions to Adams School Parking
  4. Adams School Parking mile 2.6 directions to Adams School Parking
  5. Parking at Charles Street mile 3 · water directions to trailhead 5
  6. Parking at Front Street mile 3 · water directions to trailhead 6
  7. Parking at Cross Street mile 4.3 directions to trailhead 7
  8. Parking at Monroe Drive mile 5.5 directions to trailhead 8
  9. Parking at Hopping Brook Road mile 6 directions to trailhead 9
  10. Upper Charles Trail parking mile 8 directions to Upper Charles Trail parking
  11. Parking at East Main Street mile 8.1 directions to trailhead 11
  12. Parking at East Main Street mile 8.1 directions to trailhead 12
  13. Parking at East Main Street mile 8.1 directions to trailhead 13
  14. Parking at East Main Street mile 8.2 directions to trailhead 14
  15. Parking at East Main Street mile 8.2 directions to trailhead 15
  16. Parking at Old Medway Road mile 8.3 directions to trailhead 16
  17. Parking at Old Medway Road mile 8.3 directions to trailhead 17
  18. Parking at Old Medway Road mile 8.3 directions to trailhead 18
  19. Parking at Carroll Street mile 8.7 directions to trailhead 19
  20. Parking at East Main Street mile 9.3 directions to trailhead 20
  21. Parking at North Bow Street mile 9.3 directions to trailhead 21
  22. Parking at North Bow Street mile 9.3 directions to trailhead 22
  23. Parking at North Bow Street mile 9.3 directions to trailhead 23
  24. Parking at Main Street mile 9.4 directions to trailhead 24
  25. Parking at Sumner Street mile 9.4 directions to trailhead 25
  26. Parking at Main Street mile 9.4 directions to trailhead 26
  27. Parking at East Main Street mile 9.4 directions to trailhead 27
  28. Parking at Granite Street mile 9.5 directions to trailhead 28
  29. Parking at Granite Street mile 9.6 directions to trailhead 29
  30. Parking at Hayward Field mile 9.6 directions to trailhead 30
  31. Parking mile 9.7 directions to trailhead 31
  32. Parking at Sumner Street mile 9.7 directions to trailhead 32
  33. Parking at Sumner Street mile 9.7 directions to trailhead 33
  34. Parking at Granite Street mile 9.7 directions to trailhead 34
  35. Parking mile 9.8 directions to trailhead 35
  36. Parking at Sumner Street mile 10.1 directions to trailhead 36
  37. Parking at Sumner Street mile 10.3 directions to trailhead 37
  38. Parking at Sumner Street mile 10.4 directions to trailhead 38
  39. Parking at Dilla Street mile 10.5 directions to trailhead 39
  40. Parking at Cedar Street mile 11.8 directions to trailhead 40
  41. Parking at Cedar Street mile 13.5 directions to trailhead 41
Milford Upper Charles Trail, Milford MA.jpg (opens in a new tab)
Milford Upper Charles Trail, Milford MA.jpg · Photo: John Phelan · CC BY 3.0 · Wikimedia Commons

About this trail

The Upper Charles Trail is a multi-use trail in Milford and Holliston, Massachusetts, with its northern end at Whitney Street in Sherborn; it is the built part of a planned 25-mile trail meant to link Milford, Hopkinton, Ashland, Holliston and Sherborn along an abandoned CSX rail bed. From Whitney Street south through Holliston to downtown Milford the trail occupies the Milford Branch, which the Boston and Worcester Railroad built south from its Framingham main line; it opened to Holliston by September 1847 and to Milford by July 1848. The last passenger train reached Milford on March 28, 1959, and the line was abandoned in the early 1980s under Conrail. CSX still owns the corridor north of Whitney Street.

Milford was the first town to open a complete section: 6.58 paved miles running from the town center north to the Hopkinton line, east to Holliston and south to the Milford Senior Center. It is open year-round but is not cleared of snow and ice. The Friends of the Milford Upper Charles Trail, an all-volunteer nonprofit, works with town boards on maintenance, and the town Parks Department handles vegetation removal and crossing signals.

In Holliston the surface is stone dust, and the town's Trails Committee maintains the trail with volunteers and town funds. In spring 2025 a MassTrails-funded top-dressing was completed on both sides of the Phipps Tunnel, between Blair Square and Cross Street. In August 2025 the committee planned a MassTrails application, due in February 2026, for work at the tunnel, and drainage work north of Monroe Drive, where the trail surface stays wet, possibly by fall 2026. Beyond the built trail, the Solomon Foundation and the MetroWest Greenway Coalition are pursuing the last 2.5 miles through Sherborn to downtown Framingham along CSX-owned track, where a feasibility study of a rail-with-trail option is underway.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

55% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
West Medway, 5.2 km from the trail's middle, 11 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384148607179848376655343
Low °F171825354655615951393123
Precipitation, in4.13.34.64.83.94.53.53.94.25.13.84.7
Snow, in13.511.9113.2000000.11.610.2
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Franklin sheet (1:62,500); the 1953 Holliston sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Milford, c. 1907–1915: B. & A. Station, canopy and track
Milford, c. 1907–1915: B. & A. Station, canopy and trackPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

1 Reddit thread about this trail, Jul 2024

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9710627, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Holliston Trails Committee meeting minutes, April 24, 2025 — Town of Holliston · government source · checked Oct 13, 2026
    Supports: MassTrails-funded stone dust re-paving, top-dressing completed on both sides of the Phipps Tunnel from Blair Square to Cross Street
  3. Holliston Trails Committee meeting minutes, August 20, 2025 — Town of Holliston · government source · checked Oct 13, 2026
    Supports: committee and volunteer maintenance with town funds, stone dust surface, MassTrails grant application due February 2026 for Phipps Tunnel work, wet surface north of Monroe Drive with possible completion in fall 2026
  4. Milford Branch — Wikipedia · organization · checked Oct 13, 2026
    Supports: Boston and Worcester Railroad, opened to Holliston by September 1847 and Milford by July 1848, last passenger train March 28, 1959, abandoned early 1980s under Conrail, trail from Whitney Street in Sherborn to downtown Milford, CSX ownership north of Whitney Street
  5. Friends of the Milford Upper Charles Trail · organization · checked Oct 13, 2026
    Supports: planned 25-mile trail and its towns on an abandoned CSX rail bed, 6.58-mile Milford section and its route, first complete section, paved, open year-round without snow clearing, Friends and Parks Department maintenance roles
  6. Upper Charles Trail Extension — The Solomon Foundation · organization · checked Oct 13, 2026
    Supports: last 2.5 miles through Sherborn to downtown Framingham, CSX-owned tracks, MetroWest Greenway Coalition, rail-with-trail feasibility study

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.