States › California

Bear Creek Bike Path

Greenway in California

Runs through Stockton · San Joaquin County

Conditions now

Loading the weather near Stockton…

Forecast by the National Weather Service for Stockton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.6 mi 5.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Bear Creek Bike Path drawn on the 1942 USGS topographic map of Lodi, California
Then: the 1942 USGS Lodi sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Bear Creek Bike Path is a paved path on the Bear Creek levee in north Stockton, San Joaquin County, California, a couple of miles north of downtown. The name comes from OpenStreetMap, which maps it as an asphalt cycleway along the levee; TrailLink lists the same route as the Bear Creek Trail, an 8-mile paved trail from Lower Sacramento Road to Paradise Point Marina with links to neighborhoods, parks and schools. No City of Stockton page for the path was found.

This record maps about 3.5 miles of the path's east-west leg along the creek, from near Faklis Park and Cosumnes Drive in the west, under Interstate 5 past Garrigan Park, across Thornton Road and Davis Road to Lower Sacramento Road. TrailLink describes the full trail as also following the creek up toward Davis Road and back south past John Muir Elementary School and Baxter Park, continuing west past Faklis Park to near Paradise Point Marina, with unpaved sections east of Lower Sacramento Road.

The path is mostly flat and paved, and crosses Thornton Road and Davis Road at street level. In 2022 the City of Stockton planned rectangular rapid flashing beacons at the Thornton Road and Davis Road crossings of Bear Creek, among four intersections in a $2.6 million project under the city's master bicycle plan funded through the federal Congestion Mitigation and Air Quality program. Parking, drinking water and sports courts are at Faklis Park, 5250 Cosumnes Drive.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lodi, 9 km from the trail's middle, 7 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F576369748188929289796557
Low °F404245475257595856504339
Precipitation, in3.53.42.51.50.70.2000.10.91.83.6
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1894 Lodi sheet (1:125,000); the 1953 Lodi South sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Stockton has master plan to improve safety for cyclists, pedestrians — Stocktonia News (August 29, 2022) · organization · checked Oct 16, 2026
    Supports: City of Stockton master bike plan project, rectangular rapid flashing beacons at Thornton Road/Bear Creek and Davis Road/Bear Creek among four intersections, $2.6 million, CMAQ funding
  3. Bear Creek Trail (Stockton) — TrailLink · web · checked Oct 16, 2026
    Supports: 8-mile paved trail, Lower Sacramento Road to Paradise Point Marina, connections to neighborhoods, parks and schools, route past John Muir Elementary School, Baxter Park, Thornton Road, Garrigan Park, I-5 and Faklis Park, unpaved sections east of Lower Sacramento Road, parking and water at Faklis Park, 5250 Cosumnes Drive
  4. Stockton: Bear Creek Trail — Great Runs · web · checked Oct 16, 2026
    Supports: levee-type path a couple of miles north of downtown Stockton, mainly paved, fairly flat
  5. Way: Bear Creek Bike Path — OpenStreetMap · web · checked Oct 16, 2026
    Supports: name, asphalt cycleway on the Bear Creek levee (TIGER name Bear Creek Levee Rd), local cycle network; mapped extent of this record from near Cosumnes Drive to Lower Sacramento Road

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.