States › California

March Lane Bike Path

Greenway in California

Runs through Stockton · San Joaquin County

Conditions now

Loading the weather near Stockton…

Forecast by the National Weather Service for Stockton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.8 mi 7.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Grand Canal Boulevard mile 2.5 directions to trailhead 1
  2. Parking at Grand Canal Boulevard mile 3 directions to trailhead 2
  3. Parking at Grand Canal Boulevard mile 3 directions to trailhead 3
  4. Parking at Grand Canal Boulevard mile 3 directions to trailhead 4
  5. Parking at McGaw Street mile 3 directions to trailhead 5
  6. Parking at McGaw Street mile 3 directions to trailhead 6
  7. Parking at Grand Canal Boulevard mile 3.1 directions to trailhead 7
  8. Parking at Tyrol Lane mile 3.1 directions to trailhead 8
  9. Parking at West March Lane mile 3.7 directions to trailhead 9
  10. Parking at West March Lane mile 4.1 directions to trailhead 10
  11. Parking at West March Lane mile 4.2 directions to trailhead 11
  12. Parking at West March Lane mile 4.3 directions to trailhead 12
  13. Parking at East March Lane mile 5.2 directions to trailhead 13
Stockton, along the trail (opens in a new tab)
Stockton, along the trail · Photo: PIZW · CC BY · Flickr

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The March Lane Bike Path is a paved bicycle and pedestrian path in north Stockton, San Joaquin County, California. A 2012 state notice for the March Lane Bicycle & Pedestrian Trail Greenscape Project describes it as an existing Class I bicycle path on the East Bay Municipal Utility District right-of-way, which runs parallel to March Lane.

That project, filed with the California Natural Resources Agency as a categorical exemption, was to create a shaded greenscape along the right-of-way by installing landscaping, irrigation and pedestrian amenities along the path. The notice does not say whether the work was completed, and no City of Stockton page describing the path was found.

The name comes from OpenStreetMap, which maps the path as a cycleway designated for bicycles and pedestrians, mostly asphalt, with marked and signal-controlled crossings at cross streets. This record maps about 4.8 miles along West and East March Lane, crossing Grand Canal Boulevard.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Stockton Metro Airport, 14.3 km from the trail's middle, 6 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F576368748390959490806757
Low °F394144475358616058514338
Precipitation, in2.72.51.91.10.60.1000.10.71.42.4
Old maps

USGS topographic maps of the trail's middle go back to the 1913 Stockton sheet (1:31,680); the 1952 Stockton West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. March Lane Bicycle & Pedestrian Trail Greenscape Project — CEQAnet, State of California (Notice of Exemption, February 15, 2012) · government source · checked Oct 16, 2026
    Supports: existing Class I bicycle path on the East Bay Municipal Utility District right-of-way parallel to March Lane in Stockton, San Joaquin County; greenscape project with landscaping, irrigation and pedestrian amenities; categorical exemption; California Natural Resources Agency
  3. Way: March Lane Bike Path — OpenStreetMap · web · checked Oct 16, 2026
    Supports: name; highway=cycleway with bicycle and foot designated; asphalt surface; crossings tagged as marked and signal-controlled on other ways of the same name

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.